Laserfiche WebLink
y • �. <br /> Melanie Curtis <br /> From: Melanie Curtis <br /> Sent: Tuesday, September 20, 2011 4:21 PM <br /> To: 'AI Musech' <br /> Subject: 465 Spring Hill Rd <br /> AI <br /> Thank you for meeting with me yesterday. As you know, the construction project at 465 Spring Hill Road falls under the <br /> City's requirement for submittal of an as-built survey prior to release of the Certificate of Occupancy (CO). The purposes <br /> for the foundation survey prior to framing and the as-built survey prior to CO are several: <br /> The foundation survey assures that, before additional resources are put into framing the structure, the foundation for the <br /> structure is placed in the correct, approved, location and at the correct elevation. <br /> Further, the as-built survey certifies the final topography of the site; assures that the property grading is conducted <br /> according to the approved grading plan to verify drainage; hardcover and structural coverage as installed conforms to <br /> both the City Code and approved levels for the project; and all other improvements to the properly not addressed by the <br /> foundation survey are of the correct size and installed in the correct location. The as-built survey also serves as a final <br /> "snap shoY'of the property to use as an accurate reference in the future as to what is approved and conforming on the <br /> property. <br /> I spoke with our engineer this AM and can offer a compromise regarding the as-built. Because hardcover is not a concern <br /> and because the property involved allows for significant spacing between adjacent homes, we can allow you to submit an <br /> as-built of only the areas where work was conducted on site, specifically the house location and driveway. I think this is <br /> a significant reduction in area considering the size of the property as a whole. I hope this helps you as it is below the <br /> standard but still fits the spirit of the code requirement. <br /> Please let me know if I can be of further assistance. <br /> Melanie <br /> Melanie Curtis <br /> Planning & Zoning Coordinator <br /> City of Orono <br /> 2750 Kelley Parkway <br /> Orono, MN 55356 <br /> Direct Dial: 952.249.4627 <br /> Fax: 952.249.4616 <br /> Planning &Zoning Office 952.249.4620 <br /> Email: mcuRisCo�ci.orono.mn.us <br /> Website: www.ci.orono.mn.us <br /> City of Orono Office Hours <br /> Monday - Friday 8:00 am to 4:30 pm <br /> 1 <br />