STORM WATER POLLUTION PREVENTION PLAN FOR <br />�p^ ' 5^ • • 1gg6 3i O <br />�1 026 � - <br />1s99l, ofN <br />RICHARD A. ZONA 90& <br />'ii Cfl =13 O'er <br />IN THE SW 114 OF SEC. 25-118-23 Pos�o1�.� g934�'%5 1ll`; <br />� 'QUO 9825 �/ �A� eQERRY� U) 1 I <br />HENNEPIN COUNTY, MINNESOTA n - - •, B '�q I I� <br />/ / a Pte` � 0 <br />4" U, <br />o <br />p 99 ( A I <br />n 50 100 <br />200 <br />SCALE IN FEET <br />STORM WATER POLLUTION PREVENTION PLAN BEFORE AND DURING CONSTRUCTION <br />1. The following storm water pollution prevention measures are shown <br />on the plans and shall be implemented prior to construction: <br />* Install silt fence around the perimeter of areas to be graded as <br />shown on the storm water pollution plan. <br />* All temporary stockpiles must have silt fence around them to trap <br />sediment. <br />" Construct rock construction entrance at field entrance to site. <br />* Phase grading work to minimize the duration that any disturbed soil <br />is exposed. <br />* Seed and mulch must be applied within 72 hours after rough grading is <br />complete. <br />* Locate stockpiles a minimum of 50 feet from ponds and site drainage routes. <br />* Remove any sediment that has been tracked onto public or private streets <br />within hours. <br />* Remove any spill of fuel, oil, or other chemical immediately upon detection. <br />* Store construction materials in an orderly manner. <br />* Repair silt fences, rock construction entrances, and other erosion and <br />sediment controls as needed. <br />2. Storm Water Pollution Prevention After Construction <br />The contractor shall implement the following storm water pollution prevention <br />measures after construction: <br />* All distrubed areas without permanent impermeable surfaces will be <br />vegetated for final stabilization. <br />* Silt fence and other erosion and sediment control devices will be removed <br />after vegetation is establsshed <br />* Contractor shall maintain a construction activity log with dates of major <br />grading activities, dates grading stops and spills. <br />* Keep SWPPP and inspection log accessible on site. <br />3. Notification <br />* If the rock construction entrance is filled with sediment the contractor <br />shall either replace the entrance or add additional rock with 24 hours of <br />detection or notification <br />* If sediment from the site is observed on adjacent streets or other properties, <br />the contractor shall remove the sediment within 24 hours of detection or notification. <br />* If sediment from the site is observed on adjacent streets or other properties, the <br />inspector shall identify the source and discharge location of the sediment and instruct <br />the contractor to implement additional erosion and sediment controls at those <br />locations to prevent future discharges. <br />* If building materials, chemicals, or general refuse is being used, stored, disposed <br />of, or otherwise managed inappropriately, the contractor shall correct such defects <br />within 24 hours of detection or notification. <br />If the discharge has occurred on the property, the contractor shall remove the <br />sediments and debris within 24 hours of notification and correct the source of <br />such materials as directed by the inspector. <br />I <br />POWER'1 z 18 <br />DOLE <br />I � <br />- III <br />II�LLJJ+JJI�` <br />W. r E \\ \ \off\ <br />DETAIL <br />1 "=30' <br />r� -S 0 I -00 <br />app v` �/ j <br />G yJ I�\ <br />9 It <br />c j, J N- <br />or / / / s> '°'� I 30 <br />N ' o <br />�- / <br />WOOD imI <br />RAIL ' <br />^W _� j - ` ' ' I / C, i / �� / j j / X1.0" / / J FENCE <br />bo <br />- ( X6,9 <br />-96,> <br />_ / N /10,10/ <br />j <br />9B6 '�/PROPO <br />DRIVEW <br />Z U1 r <br />00 <br />I <br />Cai <br />J fl / / I _ <br />\ �AN�' �i� j/ DRIVEWAY EASEMENT AS LISTED <br />^'.... ............ <br />0IN OLD REPUBLIC NATIONAL TITLE <br />INSURANCE COMPANY COMMITMENT <br />4>-1 ;\NQS\' y '/ ' �j ` N0. ORTE722900 DATED 10-7-09 <br />I3p� /�;,///, // ado <br />HxREA <br />CR -8 -0-AL <br />AC.RIES EXCLUDING i RO D / /� ` i M7TE �7 0°A >o <br />Al <br />/ 0 <br />\ 9 <br />63 <br />'// �O'� <br />0 <br />/l l A l� l I / ��• '-/�• �/ / Y2' �•' ELV0 <br />PINE POWER <br />,a 1 \ POLE <br />��Y: <br />500' �d 1 <br />LINE 1 q 10 <br />0. <br />E x _ }fly 70Ir <br />Y NOTE: o <br />CUTOFF <br />/28" I O <br />. '� ' / i DRIVEWAY ZONA PROPERTY <br />/VGHi ,�� 10 10.w000 0 <br />` <br />FAIL <br />ENCE 01)_ <br />OVER D <br />GARAGE 3O WIRE / <br />irn <br />•1 24.4 o IBM / / i 96" APPLE / �• <br />P�I?fg�UEE , 2 / i ..-. <br />WER) w L ENCOFAWELP�LE O <br />10 <br />0 <br />3 \ � � I t� W� �., `� ' �� � 1031.8) <br />\ L-00 <br />� ---8"-�'J 44"ELM � t � � � �I li �I � / �b0� � I p - � � / <br />WHITED A. WHIT <br />w \ OAK OIJC� <br />\ P , I OSED ° 3 N <br />i� ,0x,2 I.N pp 01 <br />oA� sassWooDI NQS€ 47.7 <br />1 1028. S <br />\ sAs 000 o ti #465 y OOD <br />C� ` \.\ \ \ EXIS I'NG MAIN Fi. 1+ L \ <br />1 -� <br />HOUSE � � ,030 � ':I\ ` •\\ j.� <br />LOW. I- <br />\ <br />%EIJ <br />MAPLE '° #465 1019.0 \+e24TT! o �R a� OEXISTING <br />BAssVJD\ 10` ELM`. / AEk. __ �. p 1 Q HOUSE <br />\ 4 <br />-\ m <br />;�2,4" <br />� �� w � � � ��� � �R��E �--- � � (0 � #445 <br />AK <br />227, <br />\\ \\ \ \\\ \ \ \WH <br />70 <br />\\WHIYE \\ =2�, `\ '�� _ o• OPEN PORH <br />'w W AI 30 <br />TE <br />o POOL <br />�A 250. - irl <br />SETBACK. <br />��P \ Hfff 24 'WH�IT<E <br />\\, WHITE. - - 30 -_ <br />v A O <br />EXISTING <br />21 _ a <br />�= <br />✓ _- <br />DECK .. \ \ \ S*rSfEr� E - <br />Y <br />_ -`�` - <br />-mac--- ----- -• ----------- - <br />L � �- --- <br />\ D/N _ <br />( L.L \ \E7t3ACk <br />_.-LINES �\�-_-` 20" - _.- -..-� K <br />WHITE WHITE <br />OAK <br />_4 X30. <br />_ -_--.- <br />- <br />--S- <br />L INE \V/E Y`-- ---- \ <br />--975\\-\ <br />o ; 970.9 -=== <br />CONTOUR-- <br />LINE (OHW) <br />PROPOSED ELEVATIONS (PER ARCHITECT) <br />LYDIARD <br />1) MAIN FLOOR = 1030.5 <br />1031.$0 LOWEST FLOOR = 1019.0 3 <br />'o <br />3) GARAGE FLOOR=1030.33 Oo <br />LAKE N <br />• 2 105+ SQ FT <br />o denotes iron marker <br />908.3 denotes :existing spot elevation, mean sea level datum <br />908.3 denotes proposed spot elevation, mean sea level datum <br />---917--- denotes existing contour line, mean sea level datum <br />denotes proposed contour line, mean sea level datum <br />denotes proposed silt fence <br />Temporary Erosion Control and Sequencing <br />1. Install perimeter control fencing per the standard detail plates. No more than <br />600 linear feet of silt fence should be continuous and collecting at one point.i <br />tt <br />Undulate the silt fence or use smles or crescents of silt fence. <br />2. Install a rock construction entrance per the standard detail plate. Rock pad <br />exits are needed where the site exits to the private drive. Rock pads should <br />be 3 inch rock, 6 inches deep, and 75 feet long and span the full width of the <br />exit. Geotextile fabric should be placed under the rock. <br />3. Use horizontal slope grading <br />4. Install erosion control around any temporary dirt stockpile areas. <br />5. All septic areas to be fenced off for protection. Protection to extend a <br />minimum of 20' outside of septic areas. <br />6. The contractor for the project shall inspect all erosion control BMP's after <br />each rainfall and repair as necessary and remove sediment from silf fences <br />if it reaches 1/3 capacity. <br />7. The contractor shall schedule his operations to minimize the amount of <br />disturbed area at any given time. The contractor shall limit his activities <br />to the grading limits as shown. <br />8. Remove all temporary BMP's once the site has reached final stabilization (a <br />uniform perennial vegetative cover with a density of 70 percent over all pervious <br />surface areas). <br />Permanent Erosion Control <br />1. All exposed soils on she must be stabilized with in 3 days: <br />a. Stabilization on slopes flatter than 4:1 consists of disc -anchored <br />mulch and seed; stabilization on slopes flatter than 4:1 and in areas <br />of concentrated flo=gs consists of erosion blankets and seed. <br />2. Temporary mulch and seed is needed for exposed areas which sit fallow for <br />3:1 or steeper in 7 days, 3:1 to 10:1 in 14 days, and flatter than 10:1 in 21 <br />days. Also open stockpiles need to have temporary stabilization if they are to <br />remain inactive for more than 7 days. <br />DATA FILES/10.lOBS/10-000/10007A ZONA/7-19-10/10007A from 10007 drawing SWPPP 8-24-10.scj <br />DESIGNED 1 HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT <br />REVISIONS <br />WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION, <br />DATE BY REMARKS AND THAT 1 AM A DULY LICENSED PROFESSIONAL ENGINEER <br />7-20-10 NEW PROPOSED HOUSE AND DRIVE SHOWN DRAWN AND LAND SURVEYOR UNDER THE LAWS OF THE STATE OF <br />MINNESOTA. <br />8-24-10 NEW CULVERT, ADD'L TOPO <br />CHECKED <br />DATE e`Lw`"1-/a MINN. LICENSE NUMBER <br />STEEL FENCE POST (T -POST), <br />MINIMUM S LONG, <br />6' MAXIMUM SPACING. <br />POST NOTCHES <br />TO FACE AWAY <br />FROM FABRIC <br />DIRECTION OF <br />SURFACE FLOW <br />MONOFILAMENT GEOTEXTILE <br />FABRIC PER MNDOT TABLE <br />3886-1. <br />ATTACH FABRIC TO POST WITH <br />MINIMUM 3 ZIP TIES (50 LB. <br />TENSILE) PER POST IN TOP 8" <br />OF FABRIC. <br />LAY FABRIC IN THE TRENCH, <br />BACKFILL WITH NATURAL <br />SOIL, AND COMPACT WITH <br />LIGHT EQUIPMENT PRIOR TO <br />PLACEMENT OF THE POST S. <br />24" MINIMUM <br />POST EMBEDMENT <br />V <br />6" <br />NOTES: <br />1. SPLICING WILL BE MADE AT OPPOSING SILT FENCE POSTS BY PLACING POSTS <br />AND SILT FENCE NEXT TO EACH OTHER AND ROTATING 360'. <br />2. HEAVY DUTY SILT FENCE IS MACHINE SLICED TYPE SILT FENCE THAT IS HAND <br />INSTALLED IN AREAS INACCESSIBLE TO EQUIPMENT DUE TO SPACE <br />LIMTTATIONS, WET SOILS, STEEP SLOPES, ETC. <br />SILT FENCE <br />HEAVY DUTY <br />LAST REVISION: <br />April 2008 <br />PLATE NO. <br />ERO-IC <br />DATE <br />11-11-09 GRONBERG & ASSOCIATES, INC. <br />SCALE <br />1"=50' CIVIL ENGINEERS, LAND SURVEYORS, LAND PLANNERS <br />JOB NO. <br />10-007 445 N. WILLOW DRIVE LONG LAKE, MN 55356 <br />1EEOF PHONE: 952-473-4141 FAX: 952-473-4435 <br />SHEETS -- _-- <br />LOT AREA = 28 - - <br />TO THE OHW OF LYDIARD LAKE <br />EXCLUDING SPRING HILL ROAD <br />0 <br />RIGHT OF WAY <br />N <br />I <br />0') <br />I <br />6 <br />G) <br />o� <br />o <br />A <br />SOUTH LINE OF <br />^ <br />I 67.85 DESC. <br />� q <br />GOVT LOT 5 <br />.----69.59MEAs. -- •�_ <br />I` <br />-- - <br />m <br />SE COR <br />_ <br />147.38 <br />------.---- <br />341 V T LOT 5 <br />7 - <br />Ln <br />MEANDER <br />CORNER <br />N 8942/ 18" <br />W <br />N <br />---- - -------------- 489.08 -------- ----- <br />o denotes iron marker <br />908.3 denotes :existing spot elevation, mean sea level datum <br />908.3 denotes proposed spot elevation, mean sea level datum <br />---917--- denotes existing contour line, mean sea level datum <br />denotes proposed contour line, mean sea level datum <br />denotes proposed silt fence <br />Temporary Erosion Control and Sequencing <br />1. Install perimeter control fencing per the standard detail plates. No more than <br />600 linear feet of silt fence should be continuous and collecting at one point.i <br />tt <br />Undulate the silt fence or use smles or crescents of silt fence. <br />2. Install a rock construction entrance per the standard detail plate. Rock pad <br />exits are needed where the site exits to the private drive. Rock pads should <br />be 3 inch rock, 6 inches deep, and 75 feet long and span the full width of the <br />exit. Geotextile fabric should be placed under the rock. <br />3. Use horizontal slope grading <br />4. Install erosion control around any temporary dirt stockpile areas. <br />5. All septic areas to be fenced off for protection. Protection to extend a <br />minimum of 20' outside of septic areas. <br />6. The contractor for the project shall inspect all erosion control BMP's after <br />each rainfall and repair as necessary and remove sediment from silf fences <br />if it reaches 1/3 capacity. <br />7. The contractor shall schedule his operations to minimize the amount of <br />disturbed area at any given time. The contractor shall limit his activities <br />to the grading limits as shown. <br />8. Remove all temporary BMP's once the site has reached final stabilization (a <br />uniform perennial vegetative cover with a density of 70 percent over all pervious <br />surface areas). <br />Permanent Erosion Control <br />1. All exposed soils on she must be stabilized with in 3 days: <br />a. Stabilization on slopes flatter than 4:1 consists of disc -anchored <br />mulch and seed; stabilization on slopes flatter than 4:1 and in areas <br />of concentrated flo=gs consists of erosion blankets and seed. <br />2. Temporary mulch and seed is needed for exposed areas which sit fallow for <br />3:1 or steeper in 7 days, 3:1 to 10:1 in 14 days, and flatter than 10:1 in 21 <br />days. Also open stockpiles need to have temporary stabilization if they are to <br />remain inactive for more than 7 days. <br />DATA FILES/10.lOBS/10-000/10007A ZONA/7-19-10/10007A from 10007 drawing SWPPP 8-24-10.scj <br />DESIGNED 1 HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT <br />REVISIONS <br />WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION, <br />DATE BY REMARKS AND THAT 1 AM A DULY LICENSED PROFESSIONAL ENGINEER <br />7-20-10 NEW PROPOSED HOUSE AND DRIVE SHOWN DRAWN AND LAND SURVEYOR UNDER THE LAWS OF THE STATE OF <br />MINNESOTA. <br />8-24-10 NEW CULVERT, ADD'L TOPO <br />CHECKED <br />DATE e`Lw`"1-/a MINN. LICENSE NUMBER <br />STEEL FENCE POST (T -POST), <br />MINIMUM S LONG, <br />6' MAXIMUM SPACING. <br />POST NOTCHES <br />TO FACE AWAY <br />FROM FABRIC <br />DIRECTION OF <br />SURFACE FLOW <br />MONOFILAMENT GEOTEXTILE <br />FABRIC PER MNDOT TABLE <br />3886-1. <br />ATTACH FABRIC TO POST WITH <br />MINIMUM 3 ZIP TIES (50 LB. <br />TENSILE) PER POST IN TOP 8" <br />OF FABRIC. <br />LAY FABRIC IN THE TRENCH, <br />BACKFILL WITH NATURAL <br />SOIL, AND COMPACT WITH <br />LIGHT EQUIPMENT PRIOR TO <br />PLACEMENT OF THE POST S. <br />24" MINIMUM <br />POST EMBEDMENT <br />V <br />6" <br />NOTES: <br />1. SPLICING WILL BE MADE AT OPPOSING SILT FENCE POSTS BY PLACING POSTS <br />AND SILT FENCE NEXT TO EACH OTHER AND ROTATING 360'. <br />2. HEAVY DUTY SILT FENCE IS MACHINE SLICED TYPE SILT FENCE THAT IS HAND <br />INSTALLED IN AREAS INACCESSIBLE TO EQUIPMENT DUE TO SPACE <br />LIMTTATIONS, WET SOILS, STEEP SLOPES, ETC. <br />SILT FENCE <br />HEAVY DUTY <br />LAST REVISION: <br />April 2008 <br />PLATE NO. <br />ERO-IC <br />DATE <br />11-11-09 GRONBERG & ASSOCIATES, INC. <br />SCALE <br />1"=50' CIVIL ENGINEERS, LAND SURVEYORS, LAND PLANNERS <br />JOB NO. <br />10-007 445 N. WILLOW DRIVE LONG LAKE, MN 55356 <br />1EEOF PHONE: 952-473-4141 FAX: 952-473-4435 <br />SHEETS -- _-- <br />