STORM WATER POLLUTION PREVENTION PLAN FOR
<br />�p^ ' 5^ • • 1gg6 3i O
<br />�1 026 � -
<br />1s99l, ofN
<br />RICHARD A. ZONA 90&
<br />'ii Cfl =13 O'er
<br />IN THE SW 114 OF SEC. 25-118-23 Pos�o1�.� g934�'%5 1ll`;
<br />� 'QUO 9825 �/ �A� eQERRY� U) 1 I
<br />HENNEPIN COUNTY, MINNESOTA n - - •, B '�q I I�
<br />/ / a Pte` � 0
<br />4" U,
<br />o
<br />p 99 ( A I
<br />n 50 100
<br />200
<br />SCALE IN FEET
<br />STORM WATER POLLUTION PREVENTION PLAN BEFORE AND DURING CONSTRUCTION
<br />1. The following storm water pollution prevention measures are shown
<br />on the plans and shall be implemented prior to construction:
<br />* Install silt fence around the perimeter of areas to be graded as
<br />shown on the storm water pollution plan.
<br />* All temporary stockpiles must have silt fence around them to trap
<br />sediment.
<br />" Construct rock construction entrance at field entrance to site.
<br />* Phase grading work to minimize the duration that any disturbed soil
<br />is exposed.
<br />* Seed and mulch must be applied within 72 hours after rough grading is
<br />complete.
<br />* Locate stockpiles a minimum of 50 feet from ponds and site drainage routes.
<br />* Remove any sediment that has been tracked onto public or private streets
<br />within hours.
<br />* Remove any spill of fuel, oil, or other chemical immediately upon detection.
<br />* Store construction materials in an orderly manner.
<br />* Repair silt fences, rock construction entrances, and other erosion and
<br />sediment controls as needed.
<br />2. Storm Water Pollution Prevention After Construction
<br />The contractor shall implement the following storm water pollution prevention
<br />measures after construction:
<br />* All distrubed areas without permanent impermeable surfaces will be
<br />vegetated for final stabilization.
<br />* Silt fence and other erosion and sediment control devices will be removed
<br />after vegetation is establsshed
<br />* Contractor shall maintain a construction activity log with dates of major
<br />grading activities, dates grading stops and spills.
<br />* Keep SWPPP and inspection log accessible on site.
<br />3. Notification
<br />* If the rock construction entrance is filled with sediment the contractor
<br />shall either replace the entrance or add additional rock with 24 hours of
<br />detection or notification
<br />* If sediment from the site is observed on adjacent streets or other properties,
<br />the contractor shall remove the sediment within 24 hours of detection or notification.
<br />* If sediment from the site is observed on adjacent streets or other properties, the
<br />inspector shall identify the source and discharge location of the sediment and instruct
<br />the contractor to implement additional erosion and sediment controls at those
<br />locations to prevent future discharges.
<br />* If building materials, chemicals, or general refuse is being used, stored, disposed
<br />of, or otherwise managed inappropriately, the contractor shall correct such defects
<br />within 24 hours of detection or notification.
<br />If the discharge has occurred on the property, the contractor shall remove the
<br />sediments and debris within 24 hours of notification and correct the source of
<br />such materials as directed by the inspector.
<br />I
<br />POWER'1 z 18
<br />DOLE
<br />I �
<br />- III
<br />II�LLJJ+JJI�`
<br />W. r E \\ \ \off\
<br />DETAIL
<br />1 "=30'
<br />r� -S 0 I -00
<br />app v` �/ j
<br />G yJ I�\
<br />9 It
<br />c j, J N-
<br />or / / / s> '°'� I 30
<br />N ' o
<br />�- /
<br />WOOD imI
<br />RAIL '
<br />^W _� j - ` ' ' I / C, i / �� / j j / X1.0" / / J FENCE
<br />bo
<br />- ( X6,9
<br />-96,>
<br />_ / N /10,10/
<br />j
<br />9B6 '�/PROPO
<br />DRIVEW
<br />Z U1 r
<br />00
<br />I
<br />Cai
<br />J fl / / I _
<br />\ �AN�' �i� j/ DRIVEWAY EASEMENT AS LISTED
<br />^'.... ............
<br />0IN OLD REPUBLIC NATIONAL TITLE
<br />INSURANCE COMPANY COMMITMENT
<br />4>-1 ;\NQS\' y '/ ' �j ` N0. ORTE722900 DATED 10-7-09
<br />I3p� /�;,///, // ado
<br />HxREA
<br />CR -8 -0-AL
<br />AC.RIES EXCLUDING i RO D / /� ` i M7TE �7 0°A >o
<br />Al
<br />/ 0
<br />\ 9
<br />63
<br />'// �O'�
<br />0
<br />/l l A l� l I / ��• '-/�• �/ / Y2' �•' ELV0
<br />PINE POWER
<br />,a 1 \ POLE
<br />��Y:
<br />500' �d 1
<br />LINE 1 q 10
<br />0.
<br />E x _ }fly 70Ir
<br />Y NOTE: o
<br />CUTOFF
<br />/28" I O
<br />. '� ' / i DRIVEWAY ZONA PROPERTY
<br />/VGHi ,�� 10 10.w000 0
<br />`
<br />FAIL
<br />ENCE 01)_
<br />OVER D
<br />GARAGE 3O WIRE /
<br />irn
<br />•1 24.4 o IBM / / i 96" APPLE / �•
<br />P�I?fg�UEE , 2 / i ..-.
<br />WER) w L ENCOFAWELP�LE O
<br />10
<br />0
<br />3 \ � � I t� W� �., `� ' �� � 1031.8)
<br />\ L-00
<br />� ---8"-�'J 44"ELM � t � � � �I li �I � / �b0� � I p - � � /
<br />WHITED A. WHIT
<br />w \ OAK OIJC�
<br />\ P , I OSED ° 3 N
<br />i� ,0x,2 I.N pp 01
<br />oA� sassWooDI NQS€ 47.7
<br />1 1028. S
<br />\ sAs 000 o ti #465 y OOD
<br />C� ` \.\ \ \ EXIS I'NG MAIN Fi. 1+ L \
<br />1 -�
<br />HOUSE � � ,030 � ':I\ ` •\\ j.�
<br />LOW. I-
<br />\
<br />%EIJ
<br />MAPLE '° #465 1019.0 \+e24TT! o �R a� OEXISTING
<br />BAssVJD\ 10` ELM`. / AEk. __ �. p 1 Q HOUSE
<br />\ 4
<br />-\ m
<br />;�2,4"
<br />� �� w � � � ��� � �R��E �--- � � (0 � #445
<br />AK
<br />227,
<br />\\ \\ \ \\\ \ \ \WH
<br />70
<br />\\WHIYE \\ =2�, `\ '�� _ o• OPEN PORH
<br />'w W AI 30
<br />TE
<br />o POOL
<br />�A 250. - irl
<br />SETBACK.
<br />��P \ Hfff 24 'WH�IT<E
<br />\\, WHITE. - - 30 -_
<br />v A O
<br />EXISTING
<br />21 _ a
<br />�=
<br />✓ _-
<br />DECK .. \ \ \ S*rSfEr� E -
<br />Y
<br />_ -`�` -
<br />-mac--- ----- -• ----------- -
<br />L � �- ---
<br />\ D/N _
<br />( L.L \ \E7t3ACk
<br />_.-LINES �\�-_-` 20" - _.- -..-� K
<br />WHITE WHITE
<br />OAK
<br />_4 X30.
<br />_ -_--.-
<br />-
<br />--S-
<br />L INE \V/E Y`-- ---- \
<br />--975\\-\
<br />o ; 970.9 -===
<br />CONTOUR--
<br />LINE (OHW)
<br />PROPOSED ELEVATIONS (PER ARCHITECT)
<br />LYDIARD
<br />1) MAIN FLOOR = 1030.5
<br />1031.$0 LOWEST FLOOR = 1019.0 3
<br />'o
<br />3) GARAGE FLOOR=1030.33 Oo
<br />LAKE N
<br />• 2 105+ SQ FT
<br />o denotes iron marker
<br />908.3 denotes :existing spot elevation, mean sea level datum
<br />908.3 denotes proposed spot elevation, mean sea level datum
<br />---917--- denotes existing contour line, mean sea level datum
<br />denotes proposed contour line, mean sea level datum
<br />denotes proposed silt fence
<br />Temporary Erosion Control and Sequencing
<br />1. Install perimeter control fencing per the standard detail plates. No more than
<br />600 linear feet of silt fence should be continuous and collecting at one point.i
<br />tt
<br />Undulate the silt fence or use smles or crescents of silt fence.
<br />2. Install a rock construction entrance per the standard detail plate. Rock pad
<br />exits are needed where the site exits to the private drive. Rock pads should
<br />be 3 inch rock, 6 inches deep, and 75 feet long and span the full width of the
<br />exit. Geotextile fabric should be placed under the rock.
<br />3. Use horizontal slope grading
<br />4. Install erosion control around any temporary dirt stockpile areas.
<br />5. All septic areas to be fenced off for protection. Protection to extend a
<br />minimum of 20' outside of septic areas.
<br />6. The contractor for the project shall inspect all erosion control BMP's after
<br />each rainfall and repair as necessary and remove sediment from silf fences
<br />if it reaches 1/3 capacity.
<br />7. The contractor shall schedule his operations to minimize the amount of
<br />disturbed area at any given time. The contractor shall limit his activities
<br />to the grading limits as shown.
<br />8. Remove all temporary BMP's once the site has reached final stabilization (a
<br />uniform perennial vegetative cover with a density of 70 percent over all pervious
<br />surface areas).
<br />Permanent Erosion Control
<br />1. All exposed soils on she must be stabilized with in 3 days:
<br />a. Stabilization on slopes flatter than 4:1 consists of disc -anchored
<br />mulch and seed; stabilization on slopes flatter than 4:1 and in areas
<br />of concentrated flo=gs consists of erosion blankets and seed.
<br />2. Temporary mulch and seed is needed for exposed areas which sit fallow for
<br />3:1 or steeper in 7 days, 3:1 to 10:1 in 14 days, and flatter than 10:1 in 21
<br />days. Also open stockpiles need to have temporary stabilization if they are to
<br />remain inactive for more than 7 days.
<br />DATA FILES/10.lOBS/10-000/10007A ZONA/7-19-10/10007A from 10007 drawing SWPPP 8-24-10.scj
<br />DESIGNED 1 HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT
<br />REVISIONS
<br />WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION,
<br />DATE BY REMARKS AND THAT 1 AM A DULY LICENSED PROFESSIONAL ENGINEER
<br />7-20-10 NEW PROPOSED HOUSE AND DRIVE SHOWN DRAWN AND LAND SURVEYOR UNDER THE LAWS OF THE STATE OF
<br />MINNESOTA.
<br />8-24-10 NEW CULVERT, ADD'L TOPO
<br />CHECKED
<br />DATE e`Lw`"1-/a MINN. LICENSE NUMBER
<br />STEEL FENCE POST (T -POST),
<br />MINIMUM S LONG,
<br />6' MAXIMUM SPACING.
<br />POST NOTCHES
<br />TO FACE AWAY
<br />FROM FABRIC
<br />DIRECTION OF
<br />SURFACE FLOW
<br />MONOFILAMENT GEOTEXTILE
<br />FABRIC PER MNDOT TABLE
<br />3886-1.
<br />ATTACH FABRIC TO POST WITH
<br />MINIMUM 3 ZIP TIES (50 LB.
<br />TENSILE) PER POST IN TOP 8"
<br />OF FABRIC.
<br />LAY FABRIC IN THE TRENCH,
<br />BACKFILL WITH NATURAL
<br />SOIL, AND COMPACT WITH
<br />LIGHT EQUIPMENT PRIOR TO
<br />PLACEMENT OF THE POST S.
<br />24" MINIMUM
<br />POST EMBEDMENT
<br />V
<br />6"
<br />NOTES:
<br />1. SPLICING WILL BE MADE AT OPPOSING SILT FENCE POSTS BY PLACING POSTS
<br />AND SILT FENCE NEXT TO EACH OTHER AND ROTATING 360'.
<br />2. HEAVY DUTY SILT FENCE IS MACHINE SLICED TYPE SILT FENCE THAT IS HAND
<br />INSTALLED IN AREAS INACCESSIBLE TO EQUIPMENT DUE TO SPACE
<br />LIMTTATIONS, WET SOILS, STEEP SLOPES, ETC.
<br />SILT FENCE
<br />HEAVY DUTY
<br />LAST REVISION:
<br />April 2008
<br />PLATE NO.
<br />ERO-IC
<br />DATE
<br />11-11-09 GRONBERG & ASSOCIATES, INC.
<br />SCALE
<br />1"=50' CIVIL ENGINEERS, LAND SURVEYORS, LAND PLANNERS
<br />JOB NO.
<br />10-007 445 N. WILLOW DRIVE LONG LAKE, MN 55356
<br />1EEOF PHONE: 952-473-4141 FAX: 952-473-4435
<br />SHEETS -- _--
<br />LOT AREA = 28 - -
<br />TO THE OHW OF LYDIARD LAKE
<br />EXCLUDING SPRING HILL ROAD
<br />0
<br />RIGHT OF WAY
<br />N
<br />I
<br />0')
<br />I
<br />6
<br />G)
<br />o�
<br />o
<br />A
<br />SOUTH LINE OF
<br />^
<br />I 67.85 DESC.
<br />� q
<br />GOVT LOT 5
<br />.----69.59MEAs. -- •�_
<br />I`
<br />-- -
<br />m
<br />SE COR
<br />_
<br />147.38
<br />------.----
<br />341 V T LOT 5
<br />7 -
<br />Ln
<br />MEANDER
<br />CORNER
<br />N 8942/ 18"
<br />W
<br />N
<br />---- - -------------- 489.08 -------- -----
<br />o denotes iron marker
<br />908.3 denotes :existing spot elevation, mean sea level datum
<br />908.3 denotes proposed spot elevation, mean sea level datum
<br />---917--- denotes existing contour line, mean sea level datum
<br />denotes proposed contour line, mean sea level datum
<br />denotes proposed silt fence
<br />Temporary Erosion Control and Sequencing
<br />1. Install perimeter control fencing per the standard detail plates. No more than
<br />600 linear feet of silt fence should be continuous and collecting at one point.i
<br />tt
<br />Undulate the silt fence or use smles or crescents of silt fence.
<br />2. Install a rock construction entrance per the standard detail plate. Rock pad
<br />exits are needed where the site exits to the private drive. Rock pads should
<br />be 3 inch rock, 6 inches deep, and 75 feet long and span the full width of the
<br />exit. Geotextile fabric should be placed under the rock.
<br />3. Use horizontal slope grading
<br />4. Install erosion control around any temporary dirt stockpile areas.
<br />5. All septic areas to be fenced off for protection. Protection to extend a
<br />minimum of 20' outside of septic areas.
<br />6. The contractor for the project shall inspect all erosion control BMP's after
<br />each rainfall and repair as necessary and remove sediment from silf fences
<br />if it reaches 1/3 capacity.
<br />7. The contractor shall schedule his operations to minimize the amount of
<br />disturbed area at any given time. The contractor shall limit his activities
<br />to the grading limits as shown.
<br />8. Remove all temporary BMP's once the site has reached final stabilization (a
<br />uniform perennial vegetative cover with a density of 70 percent over all pervious
<br />surface areas).
<br />Permanent Erosion Control
<br />1. All exposed soils on she must be stabilized with in 3 days:
<br />a. Stabilization on slopes flatter than 4:1 consists of disc -anchored
<br />mulch and seed; stabilization on slopes flatter than 4:1 and in areas
<br />of concentrated flo=gs consists of erosion blankets and seed.
<br />2. Temporary mulch and seed is needed for exposed areas which sit fallow for
<br />3:1 or steeper in 7 days, 3:1 to 10:1 in 14 days, and flatter than 10:1 in 21
<br />days. Also open stockpiles need to have temporary stabilization if they are to
<br />remain inactive for more than 7 days.
<br />DATA FILES/10.lOBS/10-000/10007A ZONA/7-19-10/10007A from 10007 drawing SWPPP 8-24-10.scj
<br />DESIGNED 1 HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT
<br />REVISIONS
<br />WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION,
<br />DATE BY REMARKS AND THAT 1 AM A DULY LICENSED PROFESSIONAL ENGINEER
<br />7-20-10 NEW PROPOSED HOUSE AND DRIVE SHOWN DRAWN AND LAND SURVEYOR UNDER THE LAWS OF THE STATE OF
<br />MINNESOTA.
<br />8-24-10 NEW CULVERT, ADD'L TOPO
<br />CHECKED
<br />DATE e`Lw`"1-/a MINN. LICENSE NUMBER
<br />STEEL FENCE POST (T -POST),
<br />MINIMUM S LONG,
<br />6' MAXIMUM SPACING.
<br />POST NOTCHES
<br />TO FACE AWAY
<br />FROM FABRIC
<br />DIRECTION OF
<br />SURFACE FLOW
<br />MONOFILAMENT GEOTEXTILE
<br />FABRIC PER MNDOT TABLE
<br />3886-1.
<br />ATTACH FABRIC TO POST WITH
<br />MINIMUM 3 ZIP TIES (50 LB.
<br />TENSILE) PER POST IN TOP 8"
<br />OF FABRIC.
<br />LAY FABRIC IN THE TRENCH,
<br />BACKFILL WITH NATURAL
<br />SOIL, AND COMPACT WITH
<br />LIGHT EQUIPMENT PRIOR TO
<br />PLACEMENT OF THE POST S.
<br />24" MINIMUM
<br />POST EMBEDMENT
<br />V
<br />6"
<br />NOTES:
<br />1. SPLICING WILL BE MADE AT OPPOSING SILT FENCE POSTS BY PLACING POSTS
<br />AND SILT FENCE NEXT TO EACH OTHER AND ROTATING 360'.
<br />2. HEAVY DUTY SILT FENCE IS MACHINE SLICED TYPE SILT FENCE THAT IS HAND
<br />INSTALLED IN AREAS INACCESSIBLE TO EQUIPMENT DUE TO SPACE
<br />LIMTTATIONS, WET SOILS, STEEP SLOPES, ETC.
<br />SILT FENCE
<br />HEAVY DUTY
<br />LAST REVISION:
<br />April 2008
<br />PLATE NO.
<br />ERO-IC
<br />DATE
<br />11-11-09 GRONBERG & ASSOCIATES, INC.
<br />SCALE
<br />1"=50' CIVIL ENGINEERS, LAND SURVEYORS, LAND PLANNERS
<br />JOB NO.
<br />10-007 445 N. WILLOW DRIVE LONG LAKE, MN 55356
<br />1EEOF PHONE: 952-473-4141 FAX: 952-473-4435
<br />SHEETS -- _--