My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-01350 - adv plan review
Orono
>
Property Files
>
Street Address
>
S
>
Spring Hill Road
>
0345 Spring Hill Road - 25-118-23-43-0008
>
Permits/Inspections
>
2017-01350 - adv plan review
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:15:25 PM
Creation date
3/4/2019 1:15:18 PM
Metadata
Fields
Template:
x Address Old
House Number
345
Street Name
Spring Hill
Street Type
Road
Address
345 Spring Hill Road
Document Type
Permits/Inspections
PIN
2511823430008
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Fees to be Char ed YES NO <br /> Permit � <br /> Plan Review �/ <br /> State Surcharge (/'' <br /> Investigation Fee <br /> SAC—Number o#SAC Units � <br /> Other(specify) �/�' <br /> S uare Foota e $ er S uare Foota e <br /> Basement X = $ <br /> 1 St Floor X = $ <br /> 2"d FIoO� X = $ <br /> Garage X = $ <br /> Estimated Construction Value: $ 2-.7, Vli� <br /> Orono Inspections Required Work Requiring Separate Permits <br /> � Footing O Site lumbing � Grading/Filling <br /> � Poured Wall � Silt Fence/Erosion Control `Mechanical 0 Fire <br /> � Foundation Survey 0 Hardcover Removal � Fireplace � Water Connection <br /> � Framing O Other(specify) � Masonry 0 Sewer Connection <br /> � Waterproofing/Drain tile 0 Mfg. 0 Lawn Irrigation <br /> 0 Foundation Waterproofing � Other(specify) � Landscaping <br /> raming 0 Septic <br /> �Insulation <br /> � As-Built Survey <br /> �Final <br /> 0 Lathe Required State Permits <br /> 0 Other(specify) <br /> � Well Electrical <br /> REMARKS (in-house): <br /> OFFICIAL REMARKS -TO BE NOTED ON PERMIT AND INITIALLED: <br /> 0 See Builder Acknowledgement Form <br /> � Prior to release of escrow money an as-built survey and hardcover calculations must be submitted and approved. <br /> Updated: June 2017 <br /> z:\forms�plan review checklist 06-2017.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.