Laserfiche WebLink
. � �Plan_ Review Checklist for New Structures / Additions <br /> Address/ PID/Legal: 2 D�Q S f'��3 <br /> Description of work: 1_,.�Pt�TI-{ i 2-� �)IQ GZ_ <br /> Septic review by: /t111'4 Date Approved: <br /> Zoning review by: Date Approved: <br /> Building review by: Date Approved: � -7 -� 6 � <br /> Grading review by: /U�/'�- Date Approved: <br /> Zoning File#: Resolution#: Resolution Date: <br /> Zonin District Fire De artment Post Office chool District <br /> Zonin . Lot Area: SF/AC Width: Depth: <br /> Survey Su itted: � Yes � No Date of Survey: <br /> Pro osed Setb ks: <br /> Front(Lake) Rear(Street) ( N S E W ) ( N S W ) Other Buildings Wetfand <br /> Side ide <br /> Building Defined Height: Buildi Peak Height: <br /> FOR A BUILDING WITH A BASEMENT O RAWL SPACE: FOR A BUILDING ON A SLAB FOUNDATION: <br /> START the distance between e basement fio / START the distance between the slab and the <br /> WITH crawl space floor and th ighest roo eak, WITH highest roof peak, the top of the cornice <br /> the top of the cornice of a t roof, e deck of a fiat roof, the deck line of a mansard <br /> line of a mansard roof, or the rmost roof, or the uppermost point on a round or <br /> oint on a round or other arch- e roof other arch-t e roof <br /> SUBTRACT half the distance between t high t SUBTRACT half the distance between the highest <br /> window and highest roof ak of a pi ed window and highest roof peak of a <br /> roof itched roof <br /> SUBTRACT the distance between e basement floor/ ADD the distance between the slab and the <br /> crawl space floor a the highest existing highest existing grade within the <br /> grade within the f undation or 10 feet, foundation <br /> whichever is le . QUALS Defined buildin hei ht <br /> EQUALS Defined buil ' hei ht <br /> Lot Coverage: SF % <br /> Shoreland Dis ct MCWD Permit Received Avera e Lak hore Setback Biuff <br /> 0 Yes No � Yes 0 No 0 N/A p Yes � No 0 N/A � Yes 0 No <br /> Permit Number: S�tback: <br /> Hardc er Zones Existin Pro osed Variance Re uired CUP Re uired <br /> 0-75' 0 Yes 0 No 0 Yes 0 No <br /> 75-250' Type�s�: pe�s�: <br /> 250-500' <br /> 500-1000' <br /> REMARKS (in-house): 4 GNf�NG <br /> Updated: 07/01/2009 <br /> z:\formslplan review checklist.doac <br />