My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-P06261 - gas fireplace
Orono
>
Property Files
>
Street Address
>
S
>
Spates Avenue
>
2080 Spates Avenue- 10-117-23-31-0104
>
Permits/Inspections
>
2003-P06261 - gas fireplace
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:25:08 PM
Creation date
2/28/2019 2:48:32 PM
Metadata
Fields
Template:
x Address Old
House Number
2080
Street Name
Spates
Street Type
Avenue
Address
2080 Spates Avenue
Document Type
Permits/Inspections
PIN
1011723310104
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
��V � <br /> �;F., <br /> �� :; � t i <br /> a�� `�` ��� r <br /> ��. ;� <br /> �f �i <br /> PERMIT FEE CALCULATION(S) <br /> � r'; <br /> � 2002 State Statute �Yes This Section Applies �;,�� <br /> �� The replacement of a Residential fixture or appliance that meets all three of the following requirements: � <br /> � <br />.;;. <br /> 1) Does not require modification to electrical or gas service. ' <br /> �� � � <br /> , 2) Has a total cost of$500.00 or less; excludin�the cost of the fixture or appliance: <br /> �� and <br /> � ;. 3) Is improved, installed ar replaced by the homeowner or licensed contractor. <br /> � <br /> ,��. Skip next section; Cost of Permit $ 15.00 <br /> � <br /> State Surcharge $ .50 � <br /> yr 4 � <br /> � �� Mail-In Fee $ 1.50 �, <br /> � <br /> � <br /> � <br />�3 If above does not apply, follow guidelines below: � <br />� <br />� ' 1. Contract Price* is .0125% of job with a Minimum Fee of($35.00) <br /> r, :� <br /> �� x .0125 $ <br /> � ` (contract price) (minimum$35.00) a. <br /> ;,: ri <br /> 2. State Surcharge. ** Add the State Building Code Division a Minimum Fee of($ .50) � <br /> �� <br /> x .0005 $ µ� <br /> (contract price) (minimum$.50) i6 <br /> 3. Posta�e and HandlinS (Only mail-in applicatio�:s) $ 1.50 <br /> �:: <br /> •.�,_ <br /> � �,' 4. TOTAL PERMIT FEE (Add lines 1-3 above) $ ;_# <br /> ��::. <br /> `�' *CONTRACT PRICE or JOB COST means the actual or estimated dollar amount charged for the permitted work including <br /> materials,labor,profit,and other fixed costs. It is the amount to be charged to the customer for the work done.If any material, <br /> equipment,labor,or installation is fumished by the owner,tenant or any other party the reasonable market value of such items <br /> must be added to the estimated cost or contract price for permit fee purposes. In the event that there is a dispute on the amount of <br /> � <br /> the job cost,the City may request the submission of a signed copy of the actual contract. <br /> � ' **The STATE SURCHARGE is.0005 of the contract price under 51,000,000 or$.50-whichever is greater.For valuations over <br />� � $1,000,000 call the Department of Inspectional Services for the price. <br /> The undersigned hereby applies to the City for issuance of a Mechanical Permit,agrees to do all work in strict accordance with <br /> the ordinances of the City and the regulations of the Ntinnesota State Building Code,and certifies that all statements made on this <br /> application are complete,true and correct. <br /> a <br /> � <br /> . a, <br /> Applicant's Signature: Date: � � � —�' 3 <br /> ,�,,;: Approved By: Date: <br /> {� <br /> h 3 p� <br /> P��, �� <br /> F �>� <br />� �� � .. � .� . . ' � � � � 4 3 �_'�%•,.c��b <br />� <br />�.,;`. <br />
The URL can be used to link to this page
Your browser does not support the video tag.