My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1996-007922 - new septic system
Orono
>
Property Files
>
Street Address
>
S
>
Somerset Lane
>
3010 Somerset Lane - 04-117-23-22-0029
>
Septic
>
1996-007922 - new septic system
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:09:38 PM
Creation date
2/25/2019 2:59:24 PM
Metadata
Fields
Template:
x Address Old
House Number
3010
Street Name
Somerset
Street Type
Lane
Address
3010 Somerset La
Document Type
Septic
PIN
0411723220029
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S'�• fiESTING, INC. Steven B. Schirmers — MPCA Cert. No. 627 <br /> 951 Katydid Lane NE • St. Michael, MN 55376 • (612) 497-3566 <br /> May 23 , 1994 <br /> Robert. Craig Homes <br /> Lot 1, B l�ock 3 <br /> Old Crystal Bay Rd. 2nd Add. <br /> Orono, Henn. Co. , MN <br /> This On-Site Sewage Treatment System is Designed for a Type l, five <br /> bedroom home Desigr.ed in accordance with the Minnesota Pollution <br /> Control Agency Chapter 7080 and local ordinances. <br /> The soils on this site are SCS soils mapped - LrB - Lester loam <br /> bordered by - Co - Cordova silty clay loam. A seasonally high <br /> water table was locatEd at 14" to 20" , (mottled soil) . Due to � <br /> the seasonally high w�ater table, a Pressurized Mound System will <br /> need to be installed. The bottom of the rock bed must be <br /> located at least 3 ' above the seasonally high water table. <br /> The soils at a depth of 12" have a percolation rate averaging <br /> 11.0 min/inch. <br /> A pumping chamber will need to be installed to lift the effluent <br /> to the treatment area. <br /> The manifold and au�ply line pipe must have back drainage to the <br /> pumping chamber. The distribution pipes shall have their ends <br /> capped. Be sure the rock and sand fill material are clean. The <br /> sod layer below the entire mounded area must be turned over, just <br /> break up the sod, be sure not to over work. <br /> The power supply and switches must be located outside the manhole <br /> and pumping chamber in a weather proof enclosure. A warning device <br /> must be installed with a light and sound device, this is in case of <br /> a pump failure. (mercury floats are a good method) . <br /> All neighboring wells are located greater than 100 ' away from the <br /> proposed treatment area. <br /> CONT.' D <br />
The URL can be used to link to this page
Your browser does not support the video tag.