Laserfiche WebLink
�� ,�:� <br /> � � <br /> CITY OF ORONO SEPTIC SYSTEM PERNIIT APPLICATION <br /> Box 66 (2750 Kelley Parkway) � �9g6 <br /> Crystal say, MN s5323 NI AY <br /> JOB SITE ADDRFSS: _� C� (U ��.:...�,,,�-,2 �<_-j � ,�. <br /> Occupancy Type: Residential j( Commercial Other <br /> Permit Type: New or Replacement 5ystem, $100.00 �-� <br /> Repair Existing System, $ 50.00 _ <br /> 0.50 State surcharge added to above fees <br /> *See fee schedule for non-residential permit fees <br /> Owner's Name: ' '� �� � Phone Number• � <br /> � �� �.�L,'�- �7�, y �� >1 <br /> Mailing Address: z Z� 7S �-�(��-Tr- ��> City: �1 � T ,s� 7ip �-_;;/ <br /> \4 / � � 7 �F,'r.G C.L •'��� �_J <br /> Contractor's Name: ,:�.-ti;,.a��- �;�s PhoneNumber: �o Z� ��-7_;,_� <br /> .n <br /> Mailing Address: �' ��?c,: � c�f � ���__--.''�, City: �4>����5 Tp: �5; 7y <br /> DO NOT MAIL PAYMENT WITH THIS APPLICATION <br /> GENERAL INSTRUCTIONS <br /> 1. Applications for septic system permits may be mailed or submitted in person at the City <br /> Offices; however, permits will not be mailed out. The permit must be picked up iri <br /> person at the City Offices and work must not begin unless the permit card is on the joY� <br /> site. <br /> 2. Permits will be issued only to contractors holding a City of Orono Septic System <br /> Installers License. <br /> 3. All work must be done in accordance with the approved septic system design. Design <br /> reports are not considered approved unless accompanied by the "City of Orono Septic <br /> System Approval" cover sheet signed by the City Inspector. <br /> 4. The following inspections will be required for all septic systems: <br /> A. Pre-installation site inspection to include inspector, installer, and general contractor. <br /> B. Tank installation prior to covering. � <br /> C. Drainfield trench installation prior to covering. For mounds, inspection is required <br /> after rough-up but prior to sand placement (sand will be jar tested for silt content), <br /> and again during pressure distribution piping installation in the rock bed. <br /> D. Final inspection to verify proper �nal cover depths and to verify that all pump station <br /> (where required) components are functional and comply with codes. <br /> 5. Individual holding MPCA Installer Certificate shall be present during inspections. A 24- <br /> hour notice is required for all inspections. <br />