Laserfiche WebLink
, - : . . ; F-17 <br /> ptP�rP SEr_.F(�`rtc��1 PROCEDURE <br /> END PEf7fOR.4TlON CF A PERFORATED L�TEn/+� <br /> A Determine pump capadty: ���•� <br /> Gravity Distribution ��.«� ' <br /> ]. Minimum suga sted is 600 gallons per hour(]0 gpm)to stay ahead of - �• �,o,�,,,,,,��,,,�,,,,,,- <br /> water use rate. `.�„'sa''`".� �""'�°'�°��°"w a`�...a <br /> .�,��,o..,�..,' <br /> 2. Maximum suggested for delivery to a drop box of a home system is 2,700 ,. . �^TM�°��a+���° ��:°^�°", <br /> Inte(Ap H�er 7eD <br /> gallons per hour(45 gpm)to pre��ent build-up of pressure in drop box. �,,•,,,„ -„ ��.� �2•�e�ao. <br /> s�Dro Flela ol R«a:rf.r <br /> . . . � f'rlrorleti LotatM a1 <br /> Pressure Distibution � �'�°^�'°�°� �"'""«`°"�°� <br /> 3.a. Select number of perforated laterals ? <br /> b. Select perforation spacing=�_feet. /e�.e.Pw'�vsom Ce;.�."� <br /> c. Su�act 2 ft from the rock layer length. <br /> ����-2ft= Ld feet <br /> d. Deternune the number of spaces between perforations. <br /> Length perf.spacing= (��ft.+z ft._�2 SpaceS Required Perforation L)i5charge <br /> e. �-�S�CeS+1 = 0�2� pflfOldtioILS/Idteldl �� in gallons per minute , <br /> f. Multipiy perforations per lateral by number of laterals to �)� DH�e � m��,, � P�� <br /> �total number of perforations.-�- x-�=j�Q,,_�_perforations. (feet) 3z ° <br /> �.��. �,s \ <br /> g- ' _�gP -- <br /> X�,�+ �• �._._ . , ��,� 1.Oa �-O.�b=�' "�74 <br /> SELECTED PUMP CAPACITY ' 3 � 'gpm ,� 2.0�j 0.80 1.U4 <br /> � <br /> B.Determine head requirements: a. Use for single family homes <br /> 1. Elevation difference between pump and point of discharge. b.Use for all other applications <br /> �_feet <br /> 2. If pumping to a pressure distribution sZ:stem,five feet for pressure <br /> required at manifold if gravity system,zero. <br /> �feet <br /> 3. Friction loss <br /> a. Enter friction loss table with gpm and pipe diameter. Pipe Lengch <br /> Read friction loss in feet per 100 feet from table. � Point of Ducharge <br /> F.L= �. lo f�/100 ft of pipe ��`t� <br /> b. Determine total pipe length from pump to discharge Elevation Difference <br /> point. Add 25 percent to pipe length for fitting p�,p _9 g�,v <br /> loss,or use a fitting loss chart. Equivalent pipe <br /> length-1.25 times pipe length= F-18b <br /> �6 D x 1.25 = /00 feet <br /> 1.S inch 2.0 inch 3.0 inch <br /> c. Calculate total friction loss by multiplying � �;a;«,i���oort�c�;� <br /> friction loss in ft/100 h by equivalent pipe length. 10 0.69 0.20 <br /> Total friction loss= �.� x��-100=�_feet 12 0.96 0.28 <br /> 4. Total head required is the sum of elevation difference, 1� 1.28 038 <br /> special head requirements,and total friction loss. 16 1.63 0.48 <br /> 18 2.03 0.60 <br /> 20 2.47 0.73 0.11 <br /> �_+�_+ � 25 3.73 1.11 0.16 <br /> (1) (2) (3c) 30 5.23 1.55 0.23 <br /> - 35 7.90 2.06 0.30 <br /> TO?AL HEAD 3 40 11.07 2.64 039 <br /> �_feet �5 14.73 3.28 0.48 <br /> SO 3.99 0.58 <br /> j5 4.76 0.70 <br /> C. Pump selection 60 5.60 0.82 <br /> 1. A pump must be selected to deliver at least <br /> �gpm (Step A) with at least ��feet of total head (Step B). <br />