Laserfiche WebLink
� s <br /> ���� <br /> v �+y <br /> �'.-i.` <br /> ���"������ � <br /> CITY OF ORONO � b���`'�S�PTIC SYSTEM PERNIIT APPLICATION <br /> Box 66 (2750 Kelley Parkway) ,��?`J <br /> Crystal Bay, l�Ti�t 55323 ' � <br /> JOB STI'E ADDRESS: Z $ O S S��..�,.� � ��'� �� <br /> Occupancy Type: Residential r-� Commercial Other <br /> Permit Type: New or Replacement System, $100.00 �--�'� <br /> Repair E�cisting System, $ 50.00 <br /> (Tanks or Drainfield) <br /> 0.50 State surcharge added to above fees <br /> *See fee schedule for non-residential permit fees <br /> Owner's Name: �ll�c�-s ��.�v �� PhdneNuinber: 739 �-- �6�9 <br /> Nlailing Address• �-Z :.��:�n ��v�� City: „�,��;, 71P� s`Si� <br /> Contractor's Name: .�j,� �� �r�_ ,T-�- PhoneNumber• �Z$—�3�3 <br /> Mailing Address: 2�2,;,d loy � A��� N- City:_���+.s, �P� SS3�5� <br /> DO NOT MAII. PAYMENT WITH THIS APPLICATION <br /> GENERAL I'�i 1STRUCTIONS <br /> 1. Applications for septic system permits may be mailed or submitted in person at the City <br /> Offices; however, permits will not be mailed out. The permit must be picked up in <br /> person at the City Offices and work must not begin unless the permit card is on the job <br /> site. <br /> 2. Permits will be issued only to contractors holding a Ciry of Orono Septic System <br /> Installers License. <br /> 2 �il .:,G_� mUSt �'J� �CP.� L^. �,r.Cnrr�un�P �z�it12 t�;P a�In,rQl,a�i �ant?C S j�ctaln rla�ian„ �QS1aI1_ <br /> i+ b' <br /> reports are not considered approved unless accompanied by the "City of Orono Septic <br /> System Approval" cover sheet signed by the City Inspector. <br /> 4. The followin� inspections will be required for all septic systems: <br /> A. Pre-installation site inspection to include inspector, installer, and general contractor. <br /> B. Tank installation prior to covering. <br /> C. Drainfield trench installation prior to covering. For mounds, inspection is required <br /> after rough-up but prior to sand placement (sand will be jar tested for silt content), <br /> and again during pressure distribution pipin� installation in the rock bed. <br /> D. Final inspection to verify proper final cover depths and to verify that all pump station <br /> (where required) components are functional and comply with codes. <br /> 5. Individual holding MPCA Installer Certificate shall be present during inspections: A 24 <br /> hour notice is required for all inspections. <br />