My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-19-2019 Planning Commission Packet
Orono
>
Planning Commission
>
2019
>
02-19-2019 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2019 10:06:17 AM
Creation date
2/20/2019 10:05:54 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
216
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
((r:4'1°11"i) <br /> I~ <br /> 2415 WILSHIRE BOULEVARD MOUND,MN 55364-1668•PH:952-472-0600• FAX:952-472-0620•WWW.CITYOFMOUND. <br /> COM <br /> February 5, 2019 By US Mail and Email <br /> Jeremy Barnhart,AICP <br /> City of Orono <br /> 2750 Kelley Parkway <br /> Orono, MN 55356-4510 <br /> RE: Inquiry Regarding Sewer Extension from City of Mound to Property at 4400 Doering Island in <br /> the City of Orono <br /> Dear Mr. Barnhart: <br /> Thank you for your email inquiry dated February 1,2019 about the proposed extension of sewer from <br /> the City of Mound to the property located at 4400 Doering Island in the City of Orono. Staff respectfully <br /> offers the following information: <br /> 1. The City of Mound would require some form of formal release from the City of Orono,in the <br /> form of a memorandum or letter to the owner, allowing the owner to seek connection to <br /> Mound-owned utility systems in lieu of separate private systems as there are only impractical or <br /> no options to connect to Orono systems.The City of Mound should be included as a recipient on <br /> this letter. <br /> 2. If released by the City of Orono, the City of Mound would allow for connection of this property <br /> to its water and sewer systems,subject to the collection of SAC, Sewer Trunk Area Charges,and <br /> Water Trunk Area Charges(number of units TBD). This would initiate quarterly utility billing <br /> against the property that would be billed directly to the property by the City of Mound. <br /> 3. The City of Mound would consider the connection infrastructure to be fully private services <br /> beyond the existing limits of Mound public infrastructure and the responsibility of the owner to <br /> maintain over time. <br /> 4. The City of Mound would anticipate the owner gaining any and/or all easement(s), as may be <br /> necessary,for the lateral corridors. The owner shall also be responsible for obtaining any/all <br /> other-agency permits for the waterbody crossing and related construction activity and providing <br /> copies of all required permits to the City of Mound prior to the commencement of any involved <br /> or related work. <br />
The URL can be used to link to this page
Your browser does not support the video tag.