My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Re: sewer project
Orono
>
Property Files
>
Street Address
>
S
>
Smith Avenue
>
140 Smith Avenue - 02-117-23-21-0028
>
Correspondence
>
Re: sewer project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:07:18 PM
Creation date
2/19/2019 12:21:37 PM
Metadata
Fields
Template:
x Address Old
House Number
140
Street Name
Smith
Street Type
Avenue
Address
140 Smith Ave
Document Type
Correspondence
PIN
0211723210028
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
„ _.. <br /> � O� <br /> O :. O <br /> .a ���` CITY of ORONO <br /> ,�� <br /> �� �r�::_ �, <br /> 5 �`� !� Municipal OtFices <br /> "�' � �.�����,�_ ti <br /> �,� �����+�;�'�'�G Street Address: • Mailing Address: <br /> ,9 a�a�� � 4 <br /> $�g0 2750 Kelley Parkway P.O. Box 66 <br /> Orono, MN 55356 Crystal Bay, MN 55323-0066 <br /> Apri120, 1998 <br /> Dear Project Area Residents; <br /> The City of Orono has scheduled a Neighborhood Informational Meeting to obtain resident <br /> comments on a proposed sanitary sewer project to serve the Orono Orchards Neighborhood. A <br /> project area map is included with this notice. This Neighborhood Meeting will be held at 7:00 <br /> P.M. Thursday, May 14th at the Orono City Council Chambers. <br /> Introduction <br /> This area was included in the recent MUSA expansion for sanitary sewer installation because of <br /> the smaller lot sizes and older septic systems with limited replacement sites available. Installation <br /> of new code compliant septic systems will be very difficult on some of the lots in this <br /> neighborhood. Approximately 25% of the septic systems in this area are currently failing, with <br /> an additional 15% in near failing condition. This area is one of ten neighborhoods included in the <br /> MUSA expansion. Sewer projects have already been completed in four areas with an additional <br /> two areas scheduled for completion this summer. We are beginning the planning process for <br /> possible 1999 projects. At this time, interest rates are low providing for more affordable projects. <br /> Project Assessments and Costs <br /> A feasibility study has been completed with an estimated project cost of $518,914 in 1998 <br /> dollars. This results in a proposed project assessment of$22,562 per unit payable over a fifteen <br /> year period. Options for prepayment of the assessment are available. Based on several projects <br /> recently completed, the estimated interest rate is 6.25%. Based on a 15-year assessment at 6.25% <br /> interest, the annual assessment payments will be approximately $2,350. These project costs and <br /> assessment payments may vary dependent on future construction costs and interest rates. <br /> Telephone (612) 473-7357 • FAX 473-0510 <br />
The URL can be used to link to this page
Your browser does not support the video tag.