Laserfiche WebLink
TO: Whomever It May Concern <br /> FROM: Stephen Weckman, On-Site Systems Manager <br /> DATE: December 10, 1998 <br /> SUBJECT: Certification of Septic System at 80 Smith Avenue <br /> The septic system at 80 Smith Ave. is non-compliant and discharging effluent to the surface. The <br /> City normally requires repair of discharging septic systems within 90 days of the inspection date. In <br /> this instance however, a municipal sewer system is currently being designed to be installed by late <br /> 1999. No repair will be required by the City as long as the tanks are pumped out to prevent surface <br /> discharge until sewer is provided. <br /> Please contact Steve Weckman if there are any questions regarding the septic system or this memo. <br />