Laserfiche WebLink
, <br /> �-�r Z- ZZ- i l� �l�nS <br /> � , PLAN REVIEW CHECKLIST FOR NEW STRUCTURES / ADDITIONS <br /> . Address: lY d J/I I l 1'i� 1 �' 1� � Permit No.: LV�v/ -�1� <br /> Description of work: �e��1� �'�,�� Date Rec'd: <br /> Septic review by: Date Approved: <br /> Zoning review by: Date Approved: <br /> � /�, <br /> Building review by: � 1��� Date Approved: z-7 l <br /> Grading review by: � l��� I U'►Vet� Date Approved: 2�L� ��D <br /> Zoning District: Zoning File#: Reso#: Reso Date: <br /> Zoning: Lot Area: SF/AC Width: Lot Coverage: SF % <br /> Survey Submitted: 0 Yes � No Date of Survey: Revised date(?): <br /> Landscape plan submitted? 0 Yes � No Landscaper: <br /> Pro osed Setbacks: <br /> Front(Lake) Rear(Street) ( N S E W ) ( N S E W ) Other Buildings Wetland <br /> Side Side <br /> Defined Height: Peak Height: FFE: FFE minus 6 feet= (Existing Contour) <br /> Perimeter(linear feet)= 50%= L.F. below grade <br /> Basement? � Yes � No� Stories <br /> - � �Y.'�... 7� { , . , _ �/�- ....`. <br /> FOR A BUILDING WITH A BASEMENT OR CRAWL SPACE: FOR A BUILDING ON A SLAB FOUNDATION: <br /> The distance between the lowest proposed Siab at or above grade— <br /> START WITH floor(of the basement or crawl space)and measure from hiahest existina <br /> the highest point of the roof. START WITH ��de to the highest point of the <br /> roof even if fill was brought in to <br /> elevate home. <br /> If you have a... <br /> SUBTRACTION • GABLE OR HIPPED ROOF(no Slab below grade—measure <br /> (BASED ON windows): Subtract half the distance from highest existing grade to the <br /> ROOF TYPE) between the highest point of the roof hi hest oint of the roof. <br /> to the low point of the corresponding if you have a... <br /> gable or hipped roof SUBTRACTION • GABLE OR HIPPED ROOF <br /> • GABLE OR HIPPED ROOF(with (BASED ON (no windows): Subtract half <br /> windows): Subtract half the distance ROOF TYPE) the distance between the <br /> between the top of the highest highest point of the roof to <br /> window and the highest point of the the low point of the <br /> roof corresponding gable or <br /> hipped roof <br /> • ALL OTHER ROOF TYPES(flat, . GABLE OR HIPPED ROOF <br /> mansard,etc):No subtraction. (with windows): Subtract <br /> SUBTRACTION Subtract the distance between the half the distance between <br /> -/ ` � (BASED ON basemenUcrawl space floor and the the top of the highest <br /> (Y��� �'���� ._._ EXiSTING highest existing grade adjacent to the window and the highest <br /> �� � , GRADES) foundation OR 10 feet(whichever is less). point of the roof <br /> ((!! 1 n '�s • ALL OTHER ROOF TYPES <br /> ���. `'`'•` _ (flat,mansard,etc):No <br /> EQUALS Deflned building height subtraction. <br /> Deflned building height <br /> �� EQUALS <br /> �' <br /> � �l`.}`- `.%� � � '. ':�4�r'.J ;. .. <br /> � ,� � j� �F � <br /> Updated: October 2015 <br /> z:\forms\plan review checklist 10-2015.docx <br />