My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Re: sewer project
Orono
>
Property Files
>
Street Address
>
S
>
Smith Avenue
>
045 Smith Avenue - 02-117-23-22-0009
>
Correspondence
>
Re: sewer project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:10:41 PM
Creation date
2/15/2019 12:42:33 PM
Metadata
Fields
Template:
x Address Old
Address
045 Smith Ave
Document Type
Correspondence
PIN
0211723220009
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�O� <br /> O O <br /> i � CITY of ORONO <br /> Y <br /> ,�{ �f�`' � � . <br /> � `" `� �E� � MUII�CI� ��CCS <br /> ����� ,�r�� Gti <br /> � � 1;� �` <br /> er � Street Address: Mailin�Address: <br /> �$+gg0g' 2150 Keiley Parkway P.O. Box 66 <br /> Orono, MN 55356 Crystal Bay, MN 55323-0066 <br /> February 18, 2000 <br /> David&Heidi Hust <br /> 45 Smith Avenue <br /> Wayzata, Mn 55391 <br /> Dear Mr. &Mrs. Hust: <br /> The above described property is in a Metropolitan Urban Service Area(MUSA) for sanitary sewer <br /> installation. 'The factors for initiating the sewer project were smaller lot sizes and non-compliant septic <br /> systems with limited replacement sites available. The residence was required to connect to the se�ver <br /> system no later than February 14, 2000. Recently, the City Council adopted a resolution allowing all <br /> sewer connections to coincide with the septic system upgrade time frame. "The time frame for a septic <br /> system upgrade is seven to ten years from the inspection date dependant upon the property's location. <br /> Your property will need to connect to the sanitary sewer system no later than December 31, 2006, which <br /> is the date your septic system was to be upgraded. A Sewer Availability Charge(SAC) fee will need to <br /> be paid to the City in the year the sewer connection is made. A licensed plumber must then obtain a <br /> permit from thc City to make the connection from the residence to the actual sewer line. <br /> If at any time before December 31, 2008 the residence undergo's a remodeling project that will increase <br /> the total water use,the residence must then connect to the sanita.ry sewer system. If at any time before <br /> the above date the system is failing,the residence must then immediately connect to the sanitary sewer <br /> system. <br /> Minor maintenance can and should still be conducted on your septic system. Pumping the septic tanks, <br /> repairing or replacing pumps, and replacement of septic tank baffles are examples of acceptable repairs. <br /> If the septic system needs major maintenance, such as septic tank replacement or drainfield replacement, <br /> connection to the sanitary sewer system will be required. <br /> If there are any questions regarding this letter, please contact me at(612) 249-4600. <br /> Re e fully, <br /> f <br /> is Pence <br /> On-Site Systems Manager <br /> Telephone(612)249-4600 • Fax(612)249-4616 <br />
The URL can be used to link to this page
Your browser does not support the video tag.