Laserfiche WebLink
UNIVERSITY S�P�ic System �tarzasge�ment Plan <br /> for Abave Grade Systems <br /> 4F MINNES4TA <br /> . <br /> Professional Mana�ement Tasks � <br /> T'hese are the operation and mainterranee actiuities that a purnper/maintainer performs tp help ensure long- <br /> term performance of yaur system. At each visit a written rcport/rccard must be provided to horneowner. <br /> Plumbin�lSource of Waatewater <br /> • Review the Water Use Appliance Chart on Page 5 with homeawner. <br /> Discuss any changes in wat�r use and the impact thase chan�es may havc on th�septic systcm. <br /> • Review water usagc rates(if availablc)wifih homeowner. <br /> Septit Tank/Fump T�aks <br /> • Manhvde lid. A riscr is recommended if the lid is not accassible from the ground surfaee. lnsulate <br /> the riser cover for frost protecrian. <br /> • Liguid l�vel. Gheck to make sure the tank is not lcaking.The liquid lcvel should be level with the <br /> bottom of th@ outlet pipe. (lf the water level is below the bottarn of the outtet pipe, the tank may <br /> nat be watcrtigktt. If the water lcve� is higher than the bottom of the outlet pipe af tho tank, thc <br /> effluant screen may need cleaning,or there may be poading in the soii troatment area.) <br /> • Inspectlon pipes. Rcplace damaged ar missing pipes and caps. <br /> . &r,f,�7e.s.Check to rnake sure they are in place and attached,and that inledoutlet baffles are cicar of <br /> buildup or abstructions. <br /> • E,�j'tuent screen. Cheek ta make surc it is in ptace; clean per rnanufacturer recommendation. <br /> Recommend retrofitted installatian if one is not pras�nt <br /> • Alarm.Verify that the alarm works. <br /> • Scum arrd sludge, Measure scurn and sludge in each campartment of each scptic and pump tank, <br /> pump if needed. <br /> Pwrap <br /> • Pump and controls. Check to make sure the pump and cantrols arc operating correctly. <br /> • Pump vault. Check to make sure it is in piace;ciean�r manufactur�r recommendations. <br /> • Alarm. Verify that the alarm works. <br /> • Drainback. Check ta make sure it is draining properly, <br /> • Event caunter ar elapsed time meter. Check to see if thcre is an event counter or elapsed time <br /> meter for the pump. lf therc is one or both,calcutate the water usage ratc and camparc ta the <br /> anticipated use listed on Dcsign and Page 2.T�use Volume: gallons: Purnp run tim�: <br /> Minutes <br /> Sail Treatment Area <br /> • Inspection pipes. Check ta make sure they are properly capped. Replaee caps and pipcs that aro <br /> damaged. <br /> • Surfcrc�»�of e,�uent. Check for surfacing effluent car other signs o�problems. <br /> • Lateral flushing. Check i�terat distributian; if cleanouts exist, flush and c(ean at recommended <br /> fnequency. <br /> • �egetatton-�Check to see that a goad growth of vegctation is covcring the system. <br /> All okher componenta—evaluate�a listed bere: <br /> -4- <br />