Laserfiche WebLink
. <br /> �- � � � � Za�1 <br /> CITY OF ORONO SEPZ'ICSYSTEI�XP�R�I�IITAPPLICATTOY <br /> Box 66 (2750 Kelley Pazkway) � <br /> Crystal Bay, biN 5�323 . � . <br /> , C� -t-L. � � <br /> JOB.STTE ADDRESS: _� �`�t O � . . : . . . . <br /> . � : Occupa.nc� Type: ~ Residential` ��� : Commercial �� _ -�OtherT� :. . : <br /> . �,- <br /> Permit T��pe: Ne�v or Replacement System, �100.00 � <br /> Repair Existina System, - � 50.00 <br /> (Tanks or Drainf eld) <br /> 0.50 State surcharge added to above fees - <br /> • <br /> . *See fee schedule for non-residential permit fees <br /> Owner's i�fame• +�<:,�: • t�J ; � ( '�w• s Fhonei\Tumber: � <br /> • g ddress: tf 3 �v G� �" �.,�-,e City: �.�c,-�-�-o �'�='� jz3 <br /> IVlaiun A Phonelti'umber: c!�r -�����' <br /> Contractor's I�'ame: �w�+�t�� ��-``�`��'�""` Ci : �P� � <br /> . ='._ �-�.- s�_. - tY - <br /> Mailing Address: -z� � <br /> . DO 1TOT i1�IAIL PA�LENT �4'YTI'H THIS APPLICATZO�T - <br /> GE\rERA�L IiYSTRUCTTO�iS �. � . � � � . � <br /> 1, ` Applications for septic�system pennits may be mailed or submitted i.n person at the Ciry <br /> Offices; however, permics will no[ be.mailed out. The permit must be picked up in <br /> person at the City Offices and work must not begin unless the permit cazd is on the job <br /> site. � . <br /> 2, permits will be issued only to contractors holdin� a City of Orono Septic System <br /> Installers License. . <br /> 3, All work must be done in accordance wich the approved sept�e YCim of O ono S pt c <br /> reports are not considered approved unless accompanied by tY <br /> � System Approval" cover sheet si�ned by the City InsPector. <br /> 4, : The followin� inspections will b� required for all septic systems: _ � � :. . � <br /> � � �,, pre-inscallation site inspection to include inspector, i.nstaller, and general contractor. <br /> B. Tank installation prior to coverin�. � ection is required <br /> C. Dra'uLfield trench ins[allation prior to coverin�. For mounds, insp <br /> after rough-up but prior to sand placement (sand will be jar tesced for silt con[eac), <br /> � and a�ain durin� pressure distribucio cove de chs and to nfy tha al PumP S�uOII <br /> D, Final i.nspection to venfy proper final p <br /> (where required) components are functional and comply with codes. <br /> 5. <br /> Iridividual holdin�IviPCA Installer Certificate shall be present durin� inspections: A 2`�" <br /> hour notice is required for all inspections. <br /> � . � . � � <br />