My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 6918
Orono
>
Property Files
>
Street Address
>
P
>
Pence La
>
2710 Pence La - 21-117-23-23-0051/46
>
Resolutions
>
Resolution 6918
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:04:49 PM
Creation date
2/14/2019 10:10:40 AM
Metadata
Fields
Template:
Address
House Number
2710
Street Name
Pence
Street Type
Lane
Address
2710 Pence La
Document Type
Resolutions
PIN
2111723230061
Supplemental fields
ProcessedPID
Updated
Document Relationships
Resolution 6918
(Message)
Path:
\Resolutions, Ordinances, Proclamations\Resolutions\Reso 0001-7499\Reso 6900 - 6999 (September 24, 2018 - July 8, 2019)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�O.4tp CITY OF ORONO <br /> RESOLUTION OF THE CITY COUNCIL <br /> y� G4' NO. 6 9 1 8 <br /> `-iKESH0l-t <br /> 2) Dedication on the plat of the perimeter Drainage and Utility Easements as required in <br /> Resolution 6907. <br /> 3) Plans and Specifications. Development within PENCE LANE ADDITION is subject to the City <br /> approved plans and specifications: <br /> a) Final grading, stormwater, drainage and erosion control plan, dated 11/16/18. <br /> b) Final stormwater pollution prevention plan (SWPPP), dated 11/16/18. <br /> 4) Access to Lot 1 will be via Walters Port Lane only. <br /> 5) Access to Lot 2 will be via the private driveway (Pence Lane) that connects to Kelly Avenue. <br /> This access is shared with 2715 Pence Lane. <br /> 6) Vehicular access to Pence Lane from Lot 1 is expressly prohibited. <br /> 7) The common Pence Lane driveway shared by Lot 2 and 2715 Pence Lane shall be maintained <br /> to provide an acceptable driving surface at all times. <br /> 8) A covenant to outline responsibility for all future maintenance activities related to the <br /> stormwater facilities shall be recorded. <br /> 9) A title opinion for the Property and certified copies of all recorded easements currently <br /> affecting the Property shall be submitted. <br /> 10)A Letter of Credit and escrow to ensure that all site improvements are installed and maintained <br /> to the City's specifications and satisfaction, shall be submitted. <br /> 11)Payment of Development Fees. Total due: $16,550.00 <br /> a. Final plat fee: $500.00. <br /> b. Park Dedication Fee: $5,550. <br /> c. Stormwater and Drainage Trunk Fee: $10,500.00. <br /> 12)Financial Guarantee. The Owners shall submit a final plat review escrow in the amount of <br /> $2,500.00 with the final plat application. <br /> Additionally, the Owners shall provide a financial guarantee to ensure the completion of <br /> site improvements. The City Engineer shall complete an estimate of improvement costs, <br /> including but not limited to storm sewers, landscaping, grading, erosion control, utilities, <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.