Laserfiche WebLink
CITY OF ORONO APPLICATION FOR MECHANICAL PERMIT Page 2 of 3 <br /> COOLING SYSTEMS <br /> * <br /> Quantity: . <br /> Make: <br /> Model: <br /> Tons: <br /> H.Power <br /> FIREPLACES <br /> Gas factory fireplace <br /> Wood burning factory�replace with flue <br /> Wood Stove <br /> Wood stove with flue <br /> Brand Name Model No. <br /> VENTILATION <br /> Na Kitchen Exhaust duct recalculating cfm <br /> Na�Bath Exhaust (must have duct outside) � C cfm <br /> No. Other Fans: Locations cfm <br /> FUEL STORAGE (MUST BE APPROVED BY FIRE MARSHAL) <br /> Installation or Removal <br /> Fuel oil: gallons underground inside outside <br /> LP Gas: gallons <br /> Other Gas opening <br /> PERMIT FEE CALCULATION(S� <br /> 2002 State Statute Yes This Section Applies <br /> The replacement of a Residential fixture or appliance that meets all three of the following requirements: <br /> 1) Does not require modification to electrical or gas service. <br /> 2) Has a total cost of$500.00 or less; excludine the cost of the fixture or appliance: <br /> and <br /> 3) Is improved, installed or replaced by the homeowner or licensed contractor. <br /> Skip next section; Cost of Permit $ 15.00 <br /> State Surcharge $ .50 <br /> Mail-In Fee $ 1.50 <br /> If above does not apply, follow guidelines below: <br /> 1. Contract Price*is .0125% of job with a Minimum Fee of($35.00� <br /> ._�li " ci--PJ <br /> x .0125 $ � S <br /> (contract price) (minimum$35.00) <br /> 2. State Surchar�e. ** Add the State Building Code Division a Minimum Fee of($.50� <br /> �� x .0005 $ ,� _� �` <br /> (contract price) (minimum$.50) <br /> http://www.ci.orono.mn.us/mechanical%20permit.html 4/11/2003 <br />