Laserfiche WebLink
g'��p CITY OF ORONO <br /> RESOLUTION OF THE CITY COUNCIL <br /> y�, ,� No. 6 9 4 1 <br /> G <br /> ��kESH��� <br /> 15)A pre-construction meeting shall be required prior to commencement of any development site <br /> work on the property. <br /> 16)Council approval is based on the entire record, above Findings. Any amendments to the plans <br /> which are not in conformity with City codes may require further Planning Commission and City <br /> Council review. <br /> 17)Authorities granted by this resolution run with the Property not with the owners, but are <br /> permissive only and must be exercised by filing a Final Plat application within one year of the <br /> date of Council approval, or the preliminary plat approvals will expire on that date (February <br /> 11, 2010). If Final Plat approval is not granted by that date, the terms and conditions of this <br /> resolution shall be null and void. The City Council at its sole discretion may extend the <br /> effective period of the preliminary plat. <br /> FINAL SUBMITTALS: <br /> Developer shall complete all requirements for Final Plat Approval as follows. The following list of <br /> final submittals must be submitted to the Planning Department at least four(4) weeks prior to the <br /> regularly scheduled Council meeting on the second and fourth Mondays of the month. These <br /> submittals are as follows: <br /> 1. Record Plat Drawings. Record plat drawings in the form of two (2) mylar copies (one <br /> copy for the City's records and one for filing with Hennepin County) and one (1) copy <br /> reduced to 1" = 200'. A digital copy is also required. Drawing to include: <br /> a. Lot lines platted per preliminary plat survey/drawing by Frank Cardarelle dated <br /> December 7, 2018 attached hereto as Exhibit A, except as modified herein. <br /> b. Dedication of"Drainage and Utility Easements" 10' along exterior property lines, 5' <br /> along the interior property lines, and over the stormwater pond, ditches and <br /> facilities. <br /> c. Dedication of"Drainage Easements" over the wetlands and drainageways. <br /> d. Name of plat. <br /> 2. Legal documents required: <br /> a. Title opinion addressed to the City or a title insurance policy in favor of the City. All <br /> owners, mortgage holders or others with property interest indicated therein shall <br /> sign the plat and all other documents affected by such interest. <br /> 6 <br />