Laserfiche WebLink
8. Balance flows for other lengths,spacing, or size <br /> Line 2 GPM = length of pipe x gallons per minute per foot(7) <br /> 31 ft x 0.34 gpm/ft = 10.4 gpm <br /> #of Perfs=GPM /flow rate(5.2) <br /> 10.4 gpm / 1.55 gpm = 6 #of Perfs (Check figure E-4) <br /> Spacing = (Length -2 feet)/(Number of perfs-1) <br /> ( 31 ft-2ft)/( 6 perfs- 1) = 5.8 feet <br /> Line 3 GPM = length of pipe x gallons per minute per foot(7) <br /> 0.0 ft x 0.34 gpm/ft = 0.0 <br /> #of Perfs=GPM /flow rate(5.2) <br /> 0.00 gpm / 0.00 gpm = 0 #of Perfs (Check figure E-4) <br /> Spacing = (Length -2 feet)/(Number of perfs-1) <br /> ( 0.0 ft-2ft)/( 0 perfs- 1)= 0.0 feet <br /> Line 4 GPM = length of pipe x gallons per minute per foot(7) <br /> 0 ft x 0.34 gpm/ft = 0.0 <br /> #of Perfs=GPM /flow rate(5.2) <br /> 0 gpm / 0.00 gpm = 0 #of Perfs (Check figure E-4) <br /> Spacing = (Length -2 feet)/(Number of perfs-1) <br /> ( 0 ft-2ft)/( 0 perfs- 1) = 0.0 feet E-20 Volume of Liquid in Pipe <br /> Pipe Diameter Liquid per foot <br /> Line 5 GPM = length of pipe x gallons per minute per foot(7) inches gallons <br /> 0 ft x 0.34 gpm/ft = 0.0 1 0.045 <br /> #of Perfs= GPM /flow rate(5.2) 1.25 0.078 <br /> 0 gpm / 0.00 gpm = 0 #of Perfs 1.5 0.11 <br /> Spacing = (Length -2 feet)/(Number of perfs-1) 2 0.17 <br /> ( 0 ft-2ft)/( 0 perfs- 1)= 0.0 feet 2.5 0.25 <br /> 3 0.38 <br /> 9. Calculate total gpm&Calculate System loading 4 0.66 <br /> Pipe volume (see figure E-20) x length <br /> Line 1 Flow= 10.4 gpm 0.17 gal/ft x 31 ft = 5.3 gal <br /> Line 2 Flow= 10.4 gpm 0.17 gal/ft x 31 ft = 5.3 gal <br /> Line 3 Flow= 0.0 gpm gal/ft x 0 ft = 0.0 gal <br /> Line 4 Flow= 0.0 gpm gal/ft x 0 ft = 0.0 gal <br /> Line 5 Flow= 0.0 gpm gal/ft x 0 ft = 0.0 gal <br /> Total = 20.8 gpm Total = 10.5 gal <br /> 10. Summary <br /> Pipe Size Perf Size Spacing <br /> Line 1 2 in 1/4 in 3.0 ft <br /> Line 2 2 in 1/4 in 5.8 ft <br /> Line 3 in 0.00 in 0.0 ft <br /> Line 4 in 0.00 in 0.0 ft <br /> Line 5 in 0.00 in 0.0 ft <br /> I hereby certify that I have completed this work in accordance with all applicable ordinances,rules and laws <br /> (signature) 810 (license#) 66//%Ch 5-- (date) <br /> Page 2 of 2 <br />