My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Soil & Percolation Testing
Orono
>
Property Files
>
Street Address
>
F
>
Fox Street
>
1815 Fox Street - 03-117-23-43-0006
>
Land Use
>
Soil & Percolation Testing
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:38:53 PM
Creation date
2/4/2019 12:03:26 PM
Metadata
Fields
Template:
x Address Old
House Number
1815
Street Name
Fox
Street Type
Street
Address
1815 Fox St
Document Type
Land Use
PIN
0311723430006
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MOUND SLOPE WIDTH&LENGTH(Greater than 1%) <br /> F. ABSORPTION WIDTH <br /> Absorption width equals absorption ratio(C4)times rock layer width(D2) <br /> 2 x 10.0 ft = 20.0 ft <br /> G. <br /> 1. Downslope absorption width=absorption width(F)minus rock layer width(D2) D-34 Slope Multiplier Table <br /> 20 ft - 10 ft = 10 ft Land <br /> Slope Upslope Downslope <br /> 2. Calculate mound size in% multipliers multipliers <br /> UPSLOPE 3:1 4:1 3:1 4:1 <br /> a.Determine depth of clean sand at upslope edge of rock layer 0 3.00 4.00 3.00 4.00 <br /> =3 feet minus distance to restricting layer(C1) 1 2.91 3.85 3.09 4.17 <br /> 3 ft - 1.5 ft= 1.5 ft 2 2.83 3.70 3.19 4.35 <br /> 3 2.75 3.57 3.30 4.54' <br /> b.Mound height at the upslope edge of rock layer=depth of clean sand for separation(G2a) 4 2.68 3.45 3.41 4.76 <br /> at upslope edge plus depth of rock layer(1 foot)to depth of cover(1 foot) 5 2.61 3.33 3.53` 5.00 <br /> 1.5 ft+1ft+1 ft= 3.5 ft 6 2.54 3.23 3.66 5.26 <br /> 7 2.48 3.12 3.80' 5.56 <br /> c.Upslope berm multiplier based on land slope(see figure D-34) 3.57 8 2.42 3.03 3.95 5.88 <br /> 9 2.36 2.94, 4.11 625 <br /> d.Upslope width=berm multiplier(G2c)times upslope mound height(G2b): 10 2.31 2.86 4.29 6.67 <br /> 3.57 x 3.5 ft = 12.0 ft 11 2.26 2.78 4.48 7.14 <br /> 12 2.21 2.70 4.69 7.69 <br /> DOWNSLOPE <br /> e.Drop in elevation=rock layer width(D2)times percent landslope(C5)/100 <br /> 10 ft x 3 % /100= . 0.3 ft <br /> f.Downslope mound height=depth of clean sand for slope difference(G2e) <br /> at downslope rock edge plus the mound height at the upslope edge of rock layer(2b) <br /> 0.3 ft + 3.5 ft = 3.8 ft <br /> g. Downslope berm multiplier based on percent land slope(see Figure D-34) 4.54 <br /> h. Downslope width=downslope multiplier(G2g)times downslope mound height(G2f) <br /> 4.54 x 3.8 - = 18.0 ft <br /> j.Total mound width is the sum of upslope(G2d)width plus rock layer width(D2)plus downslope width(G2h) <br /> 12.0 ft+ 10.0 ft + 18.0 ft = 40.0 ft <br /> k.Total mound length is the sum of upslope width(G2d)plus rock layer length(D3) <br /> plus upslope width(G2d) <br /> 12.0 ft + 62.0 ft + 12.0 ft = 86.0 ft <br /> Final Dimensions (slope>1%) 40.0 ft x 86.0 ft <br /> I hereby certify that I have completed this work in accordance with all applicable ordinances,rules and laws <br /> �r��z� (Signature) ?i/p (License#) 6////f2.5-(date) <br />
The URL can be used to link to this page
Your browser does not support the video tag.