My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
permitting checklist/schedule
Orono
>
Property Files
>
Street Address
>
S
>
Sixth Avenue North
>
3960 Sixth Ave N - 29-118-23-33-0009
>
Misc
>
permitting checklist/schedule
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:26:47 PM
Creation date
2/1/2019 3:08:23 PM
Metadata
Fields
Template:
x Address Old
House Number
3960
Street Name
6th
Street Type
Avenue
Street Direction
North
Address
3960 6th Avenue North
Document Type
Misc
PIN
2911823330009
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 REVISOR 7850.5300 <br /> to the commission and the applicant shall file under the applicable provisions of parts <br /> 7850.1000 to 7850.5600 for a permit from the commission. <br /> 5ubp. 5. Environmental review. A local unit of government that maintains <br /> jurisdiction over a qualifying project shall prepare an environmental assessment on the <br /> project. The local unit of government shall afford the public an opportunity to participate <br /> in the development of the scope of the environmental assessment before it is prepared. <br /> Upon completion of the environmental assessment, the local unit of government shall <br /> publish notice in the EQB Monitor that the environmental assessment is available for <br /> review, how a copy of the document may be reviewed, that the public may comment on <br /> the document, and the procedure for submitting comments to the local unit of government. <br /> The local unit of government shall provide a copy of the environmental assessment to the <br /> PUC upon completion of the document. The local unit of government shall not make a <br /> final decision on the permit until at least ten days after the notice appears in the EQB <br /> Monitor. If more than one local unit of government has jurisdiction over a project, and <br /> the local units of government cannot agree on which unit will prepare the environmental <br /> assessment, any local unit of government or the applicant may request the commission to <br /> select the appropriate local unit of government to be the responsible governmental unit to <br /> conduct an environmental review of the project. <br /> Subp. 6. No local authority. In the event a local unit of government that might <br /> otherwise have jurisdiction over a proposed large electric power generating plant or <br /> high voltage transmission line determines that it has no ordinances or other provisions <br /> for reviewing and authorizing the construction of such project or has no capability of <br /> preparing an environmental assessment on the project, the local unit of government shall <br /> refer the matter to the PUC for review. <br /> Subp. 7. Matters excluded. When the Public Utilities Commission has issued a <br /> Certificate of Need for a large electric power generating plant or high voltage transmission <br /> line or placed a high voltage transmission line on the certified HVTL list maintained <br /> by the commission, the local unit of government shall not address questions of need, <br /> including size, type, and timing; questions of alternative system configurations; or <br /> questions of voltage. <br /> Statutory Authority: MS s 116C.66; 216E.16 <br /> History: 27 SR 1295; L 2005 c 97 art 3 s 19 <br /> Posted: September 18, 2009 <br /> Copyright 02009 by the Revisor of Statutes,State of Minnesota. All Rights Reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.