Laserfiche WebLink
f i <br /> 2. Demolition debris will be kept off adjoining property and/or the public rights-of way unless <br /> specific prior approval is obtained in writing for temporary use thereof. <br /> 3. Foundations shall be completely removed from the ground. <br /> 4. All demolition debris shall be completely disposed of off site in accordance with all <br /> applicable PCA requirements. <br /> 5. Water wells must be abandoned in accordance with State Health Department regulations. <br /> 6. Inspection required when all debris has been removed, before backfilling. <br /> 7. Within 5 working days of superstructure removal, a final inspection shall be requested. The <br /> site shall be left clean and clear of all debris, with any excavation filled with earth level with <br /> the adjacent ground elevation (except when such excavation is to be used as part of a new <br /> building and such new building is actually under construction). <br /> 8. Septic systems must be abandoned per Minnesota Rules Chapter 7080. All septic tanks <br /> must be pumped, crushed and filled with native soils. An inspection is required after the <br /> tanks are pumped and before the tanks are crushed and filled. <br /> 9. The undersigned owner shall and hereby does indemnify and hold harmless the City of <br /> Orono, its agents, employees and assigns from and against all claims, damages, losses or <br /> expenses, including attorney fees, against the City, its agents, employees and assigns arising <br /> out of or resulting from the demolition described herein as performed by the property owner, <br /> his employees, agents, subcontractors or assigns. <br /> PERMIT TYPE AND FEE CALCULATION <br /> � $50.00—Principal Structure <br /> � $30.00 —Accessory Structure � (how many) _��,�� (what) <br /> 1. Subtotal of above permit requested $ ��l� <br /> 2. State Surcharge $ .50 <br /> 3. TOTAL PERMIT FEE (add lines 1-2 above) $ �-.J� <br /> The undersigned herby applies to the City of Orono for issuance of a Demolition Pertnit, agrees <br /> to do all the work in a strict accordance with the ordinances of the City and the regulations of <br /> the State of Minnesota, and certifies that all statements made on this application are complete, <br /> true and correct. <br /> Applicant's Signatur • Date: � Z �� <br /> Owner's Signature: Date: 6 <br /> Approved By: ���^^� Date: � -3� c:1 <br /> (Bu�ldmg Official) <br /> * Zoning Disclosure Required? ❑ YES � <br /> *This must be filled out by Zoning Depart nswer,a Zoning Official must sign all applications. <br /> * Approved By: Date: � �� <br /> ng Official) <br /> � �� a f ,d 'j`� <br />