Laserfiche WebLink
._- _._.____.... <br /> .�_ � ��.. <br /> � �' .. A <br /> �/O'' � \,'`� <br /> ��� � � CITY o� UIZONO <br /> ,, <br /> �� �� <br /> �, ,� � <br /> , � '� ���.` Municipal Offices <br /> ` i , . <br /> � � ' �'`� G " St�eet Address: Mailing Address: <br /> -��9.kEsxp'4�� 2150 Kelley Parkway P.O. Boz 66 <br /> � - --..-..- Orono, MN 55356 Crystal Bay, MN 55323•0066 <br /> To: The Current Owner of Address 3 c�S� � S � �"�'�'"�`� <br /> � <br /> City Ordinance requires that onsite sewage treatment systems in Orono be <br /> inspected on a periodic basis. The onsite sewage treatment system at the above <br /> address has been inspected and the following is known about the system. A <br /> sketch of the known components of the system is available for most properties at <br /> the Orono City Hall. <br /> Imminent Public Health Threat <br /> Yes �No <br /> If yes, please contact the Onsite Systems Manager at 952-249-4626 within 10 <br /> days of receipt of this notice. The septic system must be brought into compliance <br /> within 90 days. Failure to do so will result in referral to the City Attorney for <br /> legal action. <br /> System Identified as Non-Compliant <br /> Yes <br /> No <br /> If yes, system must be brought into compliance by: <br /> December 31, 2007 <br /> December 31, 2010 <br /> Other <br /> Septic Tan�k(�ump out Needed <br /> Yes � <br /> No <br /> The City recommends the septic tank(s) and/or lift tanl:be serviced and pumped <br /> out every three years. City records indicate the tank(s) were last pumped out on <br /> /l,�c� '-P��: . The tank(s) should be cleaned through the manhole and <br /> not through the inspection pipes, this allows for proper cleaning. <br /> Gomments: <br /> � <br /> Inspector 3 Date of Inspection l'^ � � <br /> '�'elep�one (952)249-4600 � Fax(�52)2�9-46fl�fi <br /> w'rvsa'.ci.o�'ono.mn.us <br />