Laserfiche WebLink
.� /.�-►n- <br /> � ,. <br /> ' '' = ' �,.�-�'f«.jt'f1��( <br /> i Shipping Tkt No: 16-483 <br /> BROWN-WILBERT TANK INSTALLATION 1NSTRUCTIONS <br /> SITE CONDITIONS <br /> 'The site must be accessible to large heavy trucks. Be free of items like trees,stumps,overhead wires and buildings that could interfere with delivery <br /> or installation. The trucks must be able to within three to six feet of placement excavation. <br /> EXCAVATION <br /> Excavation should be approximately 12"minimum larger than tank size to allow for adequate back fill;this may vary with soil conditions. <br /> Excavation shall have a level bottom so the weight bears on the outside walls of the tank. <br /> BEDDING <br /> Proper use of bedding materials is important to ensure service life of the tank structure. Bedding must be capable of bearing the weight of the tank. <br /> Bedding material shall have the ability of]00%to be able to pass through a'/4"screen. Bedding thickness shall be 4"minimum compacted <br /> (thickness may vary with existing soil conditions). <br /> JOINT SEAL <br /> Joint surfaces must be clean and proper placement of sealant according to manufactures recommendations. <br /> WATER TABLE <br /> Tanks being placed where water levels can potentially be higher than the elevation of the tank cover must be brought to the attention of Brown- <br /> Wilbert,Inc. Either an altemate location should be considered or a waterproof coating applied to tank. <br /> BACKFILL MATERIAL <br /> Sidewalls of tanks require dry backfill materials that have the ability of 100%to be able to pass through a 2"screen and have a minimum of 12"on <br /> all sides from bottom to top of tank. Backfill material shall be placed in a manner to avoid impact loads on the sidewall of tank. <br /> COVER MATERIAL <br /> Cover material shall be dry soil,sand or gravel and have the ability of 100%to be able to pass through a 4"screen. Cover material shall be <br /> mounded over tank and around risers to direct run-off away from both. <br /> INLET&OUTLET FiNAL,jVSPECTION <br /> Pip.,not ta eaceed 1"pasi ir.tericr v.�a?1 of tank where a baffle is used. ���Passed <br /> BURIAL DEPTH ❑ failed <br /> Tanks not to exceed the maximum burial depth of each model's specifications. <br /> Model#: 1500 2C Liquid Capacity: 1005/504 Max.Burial Depth: 7 FT Qty: 1 Date of Mfg:(i-�7 ry(e <br /> Model#: Liquid Capacity: Max.Burial Depth: Qty: Date of Mfg: <br /> Model#: Liquid Capacity: Max.Burial Depth: Qty: Date of Mfg: <br /> Customer: Septic Check,Inc. Date&Time to Deliver: 7/27/2016 10:00 <br /> Delivery Address: Tanks <br /> 3585 6 AVE NORTH ORONO t Sent Item Returned t <br /> 1 1500 2C <br /> a`, <br /> > <br /> .` <br /> � <br /> Directions: All other Supplies T <br /> � <br /> t Sent SUPPLIES Retur ed t v � <br /> 1 PUMP-PAD V � �` <br /> 6 RISER lfT � fO�'�+ <br /> 3 RISER 2FT V•' O <br /> ..J ��Y a T ' � � � <br /> m ° <br /> v � <br /> � � v <br /> � � � _ <br /> z o o � <br />