Laserfiche WebLink
� �CTTY OF ORONO SEPTIC SYSTENI PERNIIT APPLICATION <br /> Box 66 (2750 Kelley Parkway) <br /> Crystal Bay, Mn 55323 <br /> JOB SITE ADDRESS � S � � � � I� � �' <br /> Occupancy Type: Residential �/Commercial Other <br /> Permit Type: New or Replacement System $100.00 <br /> Repair Existing System � 50.00 <br /> (Tanks or Drainfield) <br /> $0.50 State surcharge added to above fees <br /> * See fee schedule for non-residential permit fees <br /> Owner'sName: /1?.�Y��� �ch�uus�� PhoneNumber: <br /> Nlailing Address: City: Zip: <br /> Contractor's Name: u_.�rz� .�So�.S Phone Number: �;jZ-�,fs'� -95� �7y'_i��L <br /> Nlailing Address:�'3�'Z - ��. S:E- City: n7.n�s-�,st Zip• �,-��-3 c�3 <br /> *** DO NOT MAIL PAYMENT"'ITH THIS APPLICATION*** <br /> GENERAL INSTRUCTIONS <br /> 1. Applications for septic system permits may be mailed or submitted in person at the City <br /> Offices; however, permits will not be mailed out. The permit must be picked up in person <br /> at the City Offices and work must not begin unless the permit card is on the job site. <br /> 2. Permits will be issued only to contractors holding a Minnesota Pollution Control <br /> Agency(MPCA) Septic System Installers License. <br /> 3. All work must be done in accordance with the approved septic system design. Design reports <br /> are not considered approved unless accompanied by the "City of Orono Septic System <br /> Approval" cover sheet signed by the City Inspector. <br /> 4. The following inspections will be required for all septic systems: <br /> A. Pre-installation site inspection to include inspector, installer, and general contractor. <br /> B. Tank installation prior to covering. <br /> C. Drainfield trench installation prior to covering. For mounds, inspection is required after <br /> rough up but prior to sand placement(sand will be jar tested for silt content), and again <br /> during pressure distribution piping installation in the rock bed. <br /> D. Final inspection to verify proper final cover depths and to verify that all pump stations <br /> (where required) components are functional and comply with codes. " <br /> 5. Individual holding�1PCAInstallers License shall be present duringall inspections. A24-hour <br /> notice is required for all inspections. <br />