Laserfiche WebLink
DuAll Service Contractors <br /> WOJCIESZAK,JOY ]0/27/2004 <br /> Area Items Total: Kitchen 1,139.36 <br /> Famiiy Room <br /> '�'� Room:Family Room <br /> H6'T-� T a �3' � <br /> � � 1 F <br /> r' 14'11'{ � <br /> : � 785.08 SF Walls 40625 SF Ceiling <br /> �° �,� " 1,191.33 SF Walls&Ceiling 398.19 SF Floor <br /> T + 1 44.24 SY Flooring 80.25 LF Floor Perimeter <br /> 1 m � b 84.44 LF Ceil.Penmeter <br /> : <br /> �-m <br /> DESCRIPTION QUANTTTY UN1T COST RCV <br /> R&R Siding-tongue&groove-cedar 406.25 SF 4.52 1,836.23 <br /> R&R Beam-8"x 8"rough sawn 68.00 LF 5.83 * 396.44 <br /> R&R 1/2"drywall-hung&fire taped only 504.25 SF 1.37 690.82 <br /> R&R Paneling 98.00 SF 1.96 192.08 <br /> R&R Batt insulation- 10"-R30 406.25 SF 1.34 544.37 <br /> Visqueen vapor barrier 406.25 SF 0.30 121.87 <br /> RBcR Crown molding-2 1/4" 84.44 LF 2.07 174.78 <br /> R&R Baseboard-2 1/4" 80.25 LF 1.70 136.43 <br /> Remove 2"x 4"lumber(.66'7 BF per LF) 56.00 LF 0.39 21.84 <br /> R&R 2"x 4"lumber-redwood-Hi�h g�rade(.667 BF per LF) 64.00 LF 4.83 309.12 <br /> Paint the walls and ceiling-one coat 1,191.33 SF 0.32 381.22 <br /> Paint crown molding-two coats 84.4,4 LF 0.81 68.39 <br /> 102104-00001 Page: 6 <br />