Laserfiche WebLink
. � , ,7► <br /> CITY OF ORONO SEPTIC SYSTEM PERNIIT APPLICATION <br /> Box 66 (2750 Kelley Parkway) <br /> Crystal Bay, MN 55323 <br /> JOB SITE ADDRESS: � �� � �� R��� _ <br /> Occupancy Type: Residential � Commercial Other <br /> Permit Type: New or Replacement System, $100.00 <br /> Repair Existing System, $ 50.00 <br /> 0.50 State surcharge added to above fees <br /> *See fee schedule for non-residential permit fees <br /> Owner's Name: �-e m f ,� /� � � m r e PhoneNumber: �f �� � � � � <br /> Mailing Address: / �� . �. City: o�••o Tp; <br /> Contractor's Name: �7`��.��., c o_ Phone Nmnber: � 4 /- �f�— <br /> Mailing Address: SS 9 �.1 0�g�t /��e_ City:!Dc�4��, Tip: s�,3��. <br /> DO NOT MAIL PAYMENT WITH THIS APPLICATION <br /> GENERAL INSTRUCTIONS <br /> 1. Applications for septic system permits may be mailed or submitted in person at the City <br /> O�ces; however, permits will not be mailed out. The permit must be picked up in <br /> person at the City Offices and work must not begin unless the permit card is on the job <br /> site. <br /> 2. Permits will be issued only to contractors holding a City of Orono Septic System <br /> Installers License. <br /> 3. All work must be done in accordance with the approved septic system design. Design <br /> reports are not considered approved unless accompanied by the "City of Orono Septic <br /> System Approval" cover sheet signed by the City Inspector. <br /> 4. The following inspections will be required for all septic systems: <br /> A. Pre-installation site inspection to include inspector, installer, and general contractor. <br /> B. Tank installation prior to covering. <br /> C. Drainfield trench installation prior to covering. For mounds, inspection is required <br /> after rough-up but prior to sand placement (sand will be jar tested for silt content), <br /> and again during pressure distribution piping installation in the rock bed. <br /> D. Final inspection to verify proper final cover depths and to verify that all pump station <br /> (where required) components are functional and comply with codes. <br /> 5. Individual holding MPCA Installer Certificate shall be present during inspections. A 24 <br /> hour notice is required for all inspections. <br /> '�� �z� <br />