My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1994-006523 - new septic system
Orono
>
Property Files
>
Street Address
>
S
>
Sixth Avenue North
>
3515 Sixth Ave N - 29-118-23-43-0002
>
Septic
>
1994-006523 - new septic system
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:26:56 PM
Creation date
1/23/2019 1:58:56 PM
Metadata
Fields
Template:
x Address Old
House Number
3515
Street Name
6th
Street Type
Avenue
Street Direction
North
Address
3515 6th Avenue North
Document Type
Septic
PIN
2911823430002
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�� ° �• F-17 <br /> PtiMP SEI,ECTION PROCEDURE <br /> ENO PERFORAT�ON OF A PERFOit4TED L4TERAL <br /> A. Determine pump capacity: �-�- <br /> Gravity Distribution ' ..�.«� <br /> 1. Minimum suggested is 600 gallons per hour(70 gpm)to stay ahead of - : • «�..N„w F,e,k,,,,a,- <br /> c.. <br /> wa ter use rate. •.� "a"S"'`'r` �'""`"�'°'��,a`�"." <br /> •Nls na.wti pevw) <br /> 2. Maximum suggested for delivery to a drop box of a home system is 2,700 _ . »�������°^�°"� <br /> gallons per hour(45 gpm)to prevent build-up of pressure in drop box. .:.,;p,„ ;�-w�ro.� �x•�o Eao• <br /> o Mia e�R«�lq« <br /> . � ' Vr�aalery lnra�W e� <br /> Pressure Distibution �"°^s°^'�� �'"'""`•'•"� <br /> 3.a. Select number of perforated laterals 3 . <br /> b. Select perforation spacing= 3 feet ����,�C,�."'"° <br /> c. Subtract 2 h.from the rock layer length. <br /> ��-2 ft._�feet <br /> d. Deternune the number of spaces between perforations. <br /> Length perf.spacing=;�,Et.+ 3 ft.__J._�spaces Required Perforation Discharge <br /> e. �_spaces+1= ��-J, perforations/lateral u+gauocu per minute(gpnj <br /> f. Multiply perforadons per lateral b number of laterals to D H d8e �2 m�,�,, i�d� <br /> get total number of perforadons.� x �„ ��_ �I � perforations. �f�c> <br /> g� �' X�'"'-�gp� 1.Oa 0.56 0.74 <br /> SELECTED PUMP CAPACITY 3 1 gpm 2.�b �.g� 1.�4 <br /> B.Determine head requirements: • a. Use for single family homes <br /> 1. Elevation difference between pump and point of discharge. b.Use for all other appluations <br /> �_feet <br /> 2. If pumping to a pressure distribution system,five feet for pressure <br /> required at manifold if gravity system,zero. <br /> S feet <br /> 3. Friction loss <br /> a. Enter friction loss table with gpm and pipe diameter. �Pe��8�► <br /> Read friction loss in feet per 100 feet from table. � • Poini of Dischar�� <br /> F.L= /_�_fG/100 ft of pipe _ �65.0. <br /> b. Determine total pipe length from pump to discharge pevation Difference� <br /> point. Add 25 percent to pipe length for fitting p„n,P ���� <br /> loss,or use a fitting loss chart. Equivalent pipe <br /> length-1.25 times pipe length= F-l8b <br /> S.O x 1.25=��feet <br /> 1.5 inch 2.0 inch 3.0 inch <br /> c. Calculate total fricdon loss by multiplying �m Friaim 1«e per 100 ft of pipc <br /> friction loss in h/100 ft by equivalent pipe length. 10 0.69 0.20 <br /> Total friction loss= ,�x /. So +100= � feet 12 0.96 0.28 <br /> 4. Total head required is the sum of elevation difference, 14 1.28 038 <br /> special head requirements,and total friction loss. 16 1.63 0.48 <br /> 18 2.03 0.60 <br /> / 20 2.47 0.73 O.11 <br /> � + J + � 25 3.73 l.11 0.16 <br /> (1) (2) (3c) 30 5.23 1.55 0.23 <br /> 35 7.90 2.06 0.30 <br /> 40 11.07 2.64 0.39 <br /> TOTAL HEAD �_feet • 45 1a.73 3.28 0.48 <br /> 50 3.99 0.58 <br /> 55 4.76 U.70 <br /> C. Pump selection bo s.bo o.s2 <br /> 1. A pump must be selected to deliver at least <br /> 3 L_gpm (Step A) with at least _j�_feet of total head(Step B). <br />
The URL can be used to link to this page
Your browser does not support the video tag.