Laserfiche WebLink
. --_. <br /> ' .�O ` <br /> � �. <br /> i','o ` <br /> /': 0.�.;, <br /> !� - �i�� CITY of O1ZON0 <br /> , <br /> �' ,� '.; T '� �I' <br /> ,�� �'.. :. G��,,',. Municipal Offices <br /> Street Address: Mailing Address: <br /> ��4�Esxp4�� 2750 Kelley Parkway P.O. Box 66 <br /> Orono, MN 55356 Crystal Bay, MN 55323•0066 <br /> To: The Cunent Owner of Address �.S i � � ti'� ��'�'' <br /> City Ordinance requires that onsite sewage treatment systems in Orono be <br /> inspected on a periodic basis. The onsite sewage treatment system at the above <br /> address has been inspected and the following is known about the system. A <br /> sketch of the known components of the system is available for most properties at <br /> the Orono City Hall. <br /> Imminent Public Health Threat <br /> Yes -�� <br /> No <br /> If yes, please contact the Onsite Systems Manager at 952-249-4626 within 10 <br /> days of receipt of this notice. The septic system must be brought into compliance <br /> within 90 days. Failure to do so will result in referral to the City Attorney for <br /> legal action. <br /> System Identified as Non-Compliant <br /> Yes �No <br /> If yes, system must be brought into compliance by: <br /> December 31, 2007 <br /> December 31, 2010 <br /> Other <br /> Septic Tank(s) Pump out Needed <br /> Yes �No <br /> The City recommends the septic tank(s) and/or lift tank be serviced and pumped <br /> out every three years. City records indicate the tank(s) were last pumped out on <br /> 'o.. �j-_�� . The tank(s) should be cleaned through the manhole and <br /> not through the inspection pipes, this allows for proper cleaning. <br /> Comments: <br /> w. <br /> Inspector: �������� �� �- Date of Inspection � ' �%� <br /> Telephonz (9�2)2-i9-�600 � �a� (952)249-�6��, <br /> w�w�w�.ci.orono.rr��a.us <br />