My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1996-008415 - septic
Orono
>
Property Files
>
Street Address
>
6
>
6th Avenue North
>
3240 6th Avenue North - 29-118-23-41-0005
>
Septic
>
1996-008415 - septic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:26:53 PM
Creation date
1/23/2019 12:16:46 PM
Metadata
Fields
Template:
x Address Old
House Number
3240
Street Name
6th
Street Type
Avenue
Street Direction
North
Address
3240 6th Avenue North
Document Type
Septic
PIN
2911823410005
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUMP SELEC"i'ION PROCEDURG <br /> A. Determine pump capacity: <br /> Gravity Distribution � ���T�� � A PERFORATEO LATERAL <br /> l. Minimum su�ested is 600 gallons per hour(10 gpm)to stay ahead of �c.a..co�.. <br /> 1 �"_l t_. <br /> water use rate. ' <br /> ' TovsoJ <br /> 2. Maximum suggested for delivery to a drop box of a home system is 2,700 �. --.:---,--',��,%'�. � <br /> Layw ol Geol��til�FoWk(a Iw- <br /> galions per hour(45 gpm)to prevent build-up of pressure in drop box. - � ��r sa�a�,�.. � ���a„.o�,�,,,,,,,,,,�,,,,,., <br /> �. M�e rca rosi�,,�qa1 <br /> n wq� q�nn Palaa�wn auaa �io.�.emonr <br /> �ii�',r:... Mlo Ca0 Near iop <br /> Pressure Distribution , � ' �--��_a ��tl�� �z•�o«o. <br /> 3. 8. Select numbcrof perforated laterals �Qion�FN10 Ra^_M.•• ..���' ol Rotk LaY�r <br /> b. Select perforaHon spacing= ft. � ` <br /> •-Ptrlwaliw�s Locoled ol <br /> C. Subtract 2 ft. from the rock layer length. �.- c,w�Sand Luya Bouom ol La���ul <br /> ��-2ft.= ft. <br /> . Or101no1 Sol� proptrly Scurified <br /> Bafort VbcMq Sond Loyer <br /> d. Determine thc number of spams betwcen perforations. <br /> Length perf.spacing= ft.+ f t.= Sp�CCS TABI.E O�PGR{apRATlON UISCt IARCIS 1N C!'M <br /> e. spaces+1 = perforations/latcral <br /> ' f. Multiply perforaHons per lateral by numbcr of latcrals to Hcad Pcrforation diameter(inches) <br /> get total number of perforations. - <br /> x - rforations. ��" ��' <br /> �r. . �K.�- P� <br /> 7.Oa OSG 0.74 <br /> p I5 0.69 0.90 <br /> p' �(s X gT gPm• Z.ob �.� �.� <br /> 2S 0.89 1.17 <br /> 3.0 0.98 1.28 <br /> SELECTED PIJMP CAPACITY�_gpm 4.o t.t3 1.9� <br /> 5.0 '126 1.65 <br /> B.Determine head requirements: <br /> 1. Elevation difference between m and �nt of dischar e. aUse 7.0 foot of head for residential systems. <br /> �p � � bUse 2U feet oE head for othcr establishments <br /> feet <br /> 2. If pumping to a pressure distribution system,add five feet for pressure <br /> required at manifold <br /> � feet <br /> 3. FriCtion loss � Pipe Length � <br /> a. Enter friction lass table with gpm and pipe diamctcr. Point of Discharge <br /> Read friction loss in feet per 10()fcet from tablc. <br /> F.L._'�ft./100 ft of piPe Elevation Difference <br /> b. Determine total pipe length from pump to discharge Pump <br /> point. Add 25 percent to pipe length for fitting <br /> loss,or use a fitHng loss chart. Equivalent pipe F-18b <br /> length-1.25 Hmes pipc length= <br /> 1.5 inch 2.0 inch 3.0 inch <br /> ��x 1.25=�fect g�,m ���d,�a.��oo n�r P�� <br /> c. Calculate total fricdon loss by multiplying �0 0.69 0.20 <br /> friction loss in ft/100 ft by equivalen�ipe la�gth. 12 0.96 0.28 <br /> Total fricdon loss= �Z x /•.�.�1(X)_�_feet t4 1.28 0.38 <br /> 4. Total head required is the sum of elevation diffcrencc, 16 1.63 0.48 <br /> s ial head uirements,and total friction loss. 18 2.03 0.60 <br /> p� reQ 20 2.47 0.73 0.11 <br /> 25 3.73 �l1� 0.16 <br /> _�+ .Jr +__� Q� 5.23 / .�53 ) 0.23 <br /> 35 7.90 �r 0.30 <br /> (1) (2) (3c) 40 11.07 2.64 039 <br /> 45 14.73 3.28 0.48 <br /> TO'TAL HF.r1D �� feet 50 3.99 0.58 <br /> SS 4.76 0.70 <br /> 60 5.60 0.82 <br /> �. Pump selection <br /> 1. A pump must be selected to deliver at least ?7 gpm (Step A) <br /> with at least��,feet of total head (Step B). <br />
The URL can be used to link to this page
Your browser does not support the video tag.