My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1996-007923 - new septic
Orono
>
Property Files
>
Street Address
>
S
>
Sixth Avenue North
>
3225 Sixth Ave N - 29-118-23-44-0001
>
Septic
>
1996-007923 - new septic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:27:09 PM
Creation date
1/23/2019 11:59:36 AM
Metadata
Fields
Template:
x Address Old
House Number
3225
Street Name
6th
Street Type
Avenue
Street Direction
North
Address
3225 6th Avenue North
Document Type
Septic
PIN
2911823440001
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S'P TE�TING, INC. Steven B. Schirmers — MPCA Cert. No. 627 <br /> T----.-. <br /> 951 Katydid Lane NE � St. Michael, MN 55376 • (612) 497-3566 <br /> May 1, 1995 <br /> Neil Heupel <br /> 3225 Co.Rd. 6 <br /> Orono, Henn. Co. , MN <br /> This On-Site Sewage Treatment System is Designed for a Type l , four <br /> bedroom home Designed in accordance with the Minnesota Pollution <br /> Control Agency Chapter 7080 and local ordinances . <br /> The soils on this site are a clay loam. A seasonally high water <br /> table waslocated at 38" to 60" , (mottled soil ) . The bottom of the <br /> system must be located at least 3 ' above the seasonally high water <br /> table. Due to the seasonally high water table, a Pressurized <br /> Mound System will need to be installed . The bottom of the rock <br /> bed must be located at least 3 ' above the seasonally hign water <br /> table. <br /> The soils at a depth of 12" have a percolation rate averaging <br /> 5 . 3 min/inch. <br /> A pumping chamber will need to be installed to lift the effluent <br /> to the treatment area. <br /> The manifold and supply line pipe must have back drainage to the <br /> pumping chamber. The distribution pipes shall have their ends <br /> capped. Be sure the rock and sand fill material are clean. The <br /> sod layer below the entire mounded area must be turned over, just <br /> break up the sod , be sure not to over work . <br /> The power supply and switches must be located outside the manhole <br /> and pumping chamber in a weather proof enclosure . A warning device <br /> must be installed with a light and sound device, this is in case of <br /> a pump failure. <br /> , <br /> All neighboring wells are located greater than �' away from the <br /> proposed treatment area. . <br /> Keep all heavy equipment off of the proposed treatment area before <br /> and after construction. The treatment area should be marked off <br /> before construction. This Design is not valid & the system will <br /> need to be relocated if failure to protect the areas proposed <br /> for On-Site Sewage Treatment occurs. <br /> CONT' D <br />
The URL can be used to link to this page
Your browser does not support the video tag.