Laserfiche WebLink
. �- - _ �-, <br /> � °1 �� � __ __�.:_) <br /> CITY OF ORONO SEPTICSYSTE1�iPER�'�IITAPPLICATION <br /> Box 66 (2750 Kelley Parkway) <br /> cry�� Bay, �� 55323 rMAY �2 �.996 <br /> � -L � � �� � � <br /> JOB SITE ADDRESS: S <br /> Commercial Other <br /> Occupancy Type: Residential - <br /> Permit Tv e: New or Replacement System, $100.00 �_ <br /> - P $ 50.00 <br /> Repair E�cisting System, <br /> (Tanks or Drainfield) <br /> �?.;0 State surcharge added to above fees <br /> *See fee schedule for non-residentiai perrnic iCCJ <br /> Owner's Name: �; �- f' �s� � <br /> �, Phone Number: `f 7� " G S/ � <br /> Cit �,�„t� ���� tiP: :SS3�6 <br /> Nlailing Address: �3'L2 S �� � � phoneNumber: z� - 7 ���3 <br /> Contractor's Name: r-}-/��-��>- �/�� � -� <br /> �_� t�t,�:=- r✓ City: ;�c t--r-,� 5 Z�P: _SJ 3� <br /> Nlailing Address: L�3 2�4 i�`% — <br /> DO NOT MAIL PAYMENT WTTH THIS APPLICATION <br /> GEiVERAL. INSTRUCTIONS <br /> 1, Applications for septic system permits may be mailed or submitted in person at the City <br /> Offices; however, permits will not be mailed out. The permit must be picked up in <br /> person at the Ciry Offices and work must not begin unless the permit card is on the job <br /> site. <br /> 2. pennits will be issued only to contractors holding a City of Orono Septic System <br /> Installers License. <br /> 3, All work must be done in accordance with the approved septic system design. Design <br /> _;,�;;,lw u-.� �iv: r.On�ci�PTelj a�r_.�ovPd ��nless acc�mpanied by the "City of Orono Septic <br /> System Approval" cover sheet signed by the Ciry Inspector. <br /> 4, The followin� inspections will be required for all septic systems: <br /> A. Pre-installation site inspection to include inspector, installer, and general contractor. <br /> B. Tank installation prior to covering. <br /> C. Drainfield trench installation prior to covering. For mounds, inspection is required <br /> after rough-up but prior to sand placement (sand will be jar tested for silt content), <br /> and a�ain during pressure distribution pipin� installation in the rock bed. <br /> D. Final inspection to verify proper final cover depths and to verify that all pump station <br /> (where required) components are functional and comply with codes. <br /> 5, Individual holding MPCA Installer Certificate shall be present during inspections: A 24- <br /> hour notice is required for all inspections. <br />