Laserfiche WebLink
I'3) 0.45 gpd/ft2 Absorption area Soil Loading Rate, which gives a mound ratio of 2.7 (minimum) <br /> (this must match the soil boring log) desired mound ratio 2.7 <br /> 24) 20 percent site slope (0-20% range) 20 (% downslope site slope, if different than upslope) <br /> 25) 18 inches, or 1.5 ft. to Redox or other limiting condition (need at least 12"to be a Type I) <br /> Treatment zone contains 0 inches of 0%soil credit, and 0 inches of 50%soil credit. Giving a: <br /> 26) 18 inch, or 1.5 ft. Sand Lift Mound CRITICAL FOR FUTURE CERTIFICATIONS!!! <br /> 27) 27.0 ft.Total ABSORPTION width (with sand beyond rockbed as follows:) <br /> 28) 0.0 ft. upslope and sideslope <br /> 17.0 ft. Downslope <br /> Individual slope ratios give BERM widths (topsoil beyond rockbed) of: <br /> 29) 4:1 upslope ratio 8 ft. upslope berm <br /> 30) 3:1 sideslope 17 ft. sideslope berms <br /> 31) 3:1 downslope 41 ft. downslope berm <br /> 32) Overall Dimensions: 10.0 ft. wide by 62.5 ft. long Rock bed <br /> 59 ft. wide by 97 ft. long Mound footprint <br /> 4" inspection pipe <br /> 18" cover on top <br /> ,<Upslope berm 8 Downslope berm 41 <br /> } <br /> 12" cover on sides <br /> (6"loamy cap&6"topsoil) <br /> [7:51 Clean sand lift <br /> _ 1.5 Depth to Limiting <br /> Limiting Condition . <br /> Absorption Width 27.0 ~—_ <br /> Note: <br /> For 0 to 1%slopes, Absorption Width is measured from the Bedequally in both directions. <br /> For slopes >1%, Absorption Width is measured downhill from the upslope edge of the Bed <br /> 33) Rock Bed: <br /> 10.0 ft. by 62.5 ft. by 6 inches under pipe, plus 20%gives 21 yds or*1.4= 29 ton <br /> 34) Mound Sand: (note: volume is based on 3:1/4:1 slope from top of rockbed, Exchange sand for loamy cap if desired) <br /> 22.3 up + 253.5 downslope + 22.5 ends+ 57.9 under rock= 427 yd3 or*1.4= 598 ton <br /> plus 20% <br /> 35) Loamy Cap: <br /> 55 ft. by 93 ft. 6"deep, plus 20%gives 114 yds or*1.4= 160 ton <br /> 36) Topsoil: <br /> 59 ft. by 97 ft. 6"deep, plus 20%gives 127 yd''or*1.4= 178 ton <br /> I hereby certify that I have completed this work in accordance with all applicable ordinances, rules and laws. <br /> Rusty Olson"s Soil& Pert 810 6/16/2018 <br /> Designer Signature Company License# Date <br />