My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-22-2019 Planning Commission Packet
Orono
>
Planning Commission
>
2019
>
01-22-2019 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2019 10:58:43 AM
Creation date
1/23/2019 10:58:05 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
334
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of Orono <br /> °No Hardcover Calculation Worksheet <br /> c��r f, <br /> Property Address: f3� 14 <br /> P7e4O <br /> � z45 �Poiz.�} S�fv ' t �lY ATA tlfv S�'3`l j s.co ell,16) <br /> Prepared by: corry41At. CO /#55 -n) Date: <br /> Stormwater Quality Overlay District Tier: (Circle one) Tier 1 Tier 2 Tier 3 Tier 4 Tier 5 <br /> Step 2: PROPOSED HARDCOVER <br /> In the following table, identify all items of proposed hardcover on the property, keyed by letter to site plan <br /> or survey (must accompany this form). Include all existing hardcover items that are intended to remain, <br /> as well as all proposed hardcover items that will be added. Use as many lines as necessary to <br /> accurately depict proposed hardcover status of the property. For Tier 1 properties, identify any features <br /> by letter which are split at the 75' setback line and calculate hardcover square footage separately for <br /> each portion. <br /> Key to Total <br /> Hardcover Item (Describe) Length x Width <br /> Survey (Square Feet) <br /> (Example) (Garage) (24'x 30') (720 S.F.) <br /> A (JO2j V5W1°fy') 21320 S.F. <br /> B P111-Y.A Of C,4vl4'r) Zr Co S.F. <br /> C 5 iY t VWes,.1. Ci0 Vk'VL- g 2 i 0 S.F. <br /> d Sib',w rt.Ks/STVPSf 0 S 9 Zo S.F. <br /> E <br /> 1yE1 S l ( S.F. <br /> F S.F. <br /> G S.F. <br /> H S.F. <br /> S.F. <br /> J S.F. <br /> K S.F. <br /> L S.F. <br /> M S.F. <br /> N S.F. <br /> O S.F. <br /> p S.F. <br /> Q S.F. <br /> R S.F. <br /> S S.F. <br /> T S.F. <br /> S.F. <br /> ✓ S.F. <br /> VV S.F. <br /> X S.F. <br /> y S.F. <br /> Z S.F. <br /> (1) Total Proposed Hardcover 1_4 32-a S.F. <br /> Excludable Hardcover(See City Code Sec 78-1884): <br /> S.F. <br /> S.F. <br /> S.F. <br /> S.F. <br /> S.F. <br /> (2) Total Excludable Hardcover S.F. <br /> (3) Net Proposed Hardcover [Subtract line(2)from line(1)] S.F. <br /> (4) Total Lot Area S.F. <br /> Proposed Hardcover Percentage [(3)_(4)] 2-1. 25 % <br /> Last Updated: July 2018 <br /> Note: This is an information sheet only, every effort has been made to insure the accuracy of the information contained <br /> herein;however, if any information is not consistent with provisions of the City Code, the Code provisions will prevail. <br /> Page 9 of 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.