My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-22-2019 Planning Commission Packet
Orono
>
Planning Commission
>
2019
>
01-22-2019 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2019 10:58:43 AM
Creation date
1/23/2019 10:58:05 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
334
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Date Application Received: December 12,2018 �O1 YO <br /> Date Application Considered as Complete:January 4,2019 <br /> 60-Day Review Period Expires: March 5,2019 <br /> To: Chair Thiesse and Planning Commission Members <br /> Dustin Rief, City Administrator <br /> From: Laura Oakden, Planner <br /> Date: January 22, 2019 <br /> Subject: LA18-000098,Jen and Tony Ishaug,4245 Chippewa Ln,Variance, Public Hearing <br /> Application Summary: The applicant is requesting front yard setback variance for a detached <br /> garage. <br /> Staff Recommendation: The Planning Commission should discuss the findings, if there is <br /> support a motion can be made to recommend approval. <br /> Background <br /> The new accessory building requirements allow a detached garage 1000 sq.ft. or smaller to be <br /> forward of the principal building, subject to conditions which include the structure should be <br /> consistent in material and color with the principal structure. The applicants have sized and <br /> designed the garage to fit these requirements. <br /> The new accessory buildings ordinance requires any accessory building forward of the principal <br /> building to meet the front yard setback. The applicants are requesting a variance to allow a 20 <br /> foot setback instead of the 100 foot required setback due to the topography of the property. <br /> LOT ANALYSIS WORKSHEET <br /> Section 78-395 -Setbacks: <br /> DISTRICT RR-1A Required Principal Existing Accessory Proposed <br /> Front 100' 192' 20' <br /> Rear 100' 320' +/-600' <br /> Side (West) 50' 50' +/-230' <br /> Side (East) 50 198' 50' <br /> Section 78-395 - Lot Area/Width: <br /> DISTRICT RR-1A Lot Area Lot Width <br /> Required 217,800 s.f. (5 acres) 300' <br /> Actual 211,701 s.f. (4.86 acre) 330' <br /> Section 78-1403-Structural Coverage: <br /> The property is over 2 acres and does not have any structure coverage requirements. <br /> Section 78-1700-Hardcover Calculations: <br /> The property is not located in the hardcover zone. <br />
The URL can be used to link to this page
Your browser does not support the video tag.