My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1993-005297 - new septic system
Orono
>
Property Files
>
Street Address
>
S
>
Sixth Avenue North
>
3060 Sixth Ave N - 28-118-23-32-0014
>
Septic
>
1993-005297 - new septic system
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:23:58 PM
Creation date
1/23/2019 10:34:00 AM
Metadata
Fields
Template:
x Address Old
House Number
3060
Street Name
6th
Street Type
Avenue
Street Direction
North
Address
3060 6th Avenue North
Document Type
Septic
PIN
2811823320014
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� �I � . <br /> ��P TESTING, INC. Steven B. Schirmers — MPCA Cert. No. 627 <br /> 951 Katydid Lane NE • St. Michael, MN 55376 • (612) 497-3566 <br /> April 4 , 1992 <br /> Greg Malik <br /> 3060 Co.Rd.#6 <br /> North Parcel, Lot 1 <br /> Orono, Henn. Co. , MN <br /> This On-Site Sewage Treatment Sysi:er�l is Designed for a Type 1, �`ive. <br /> (Design sliows 5BR for Sub-Div) bedroom Yi�me in accord�iic� witti tY�e <br /> Minnesota Pollution Control Agency CYiapt�i 7Q80 and local ordir.aiices. <br /> The soils on this site are SCS soils mapped - L+B - LeSueui loar►�. <br /> A seasonally high water table was located at 12" to 22" deep, <br /> (mottled soil) . Due to the �easonally tiic�h ��ater table, a <br /> Pressurized Mound System will neec� to be installed. The bc�ttorn <br /> of the rock bed must be located at least 3 ' above the seasonally <br /> high water table. � <br /> The soils at a depth of 12" have a percolati�n rate �veraging 10. 4 <br /> min/inch and are adequate for treatincJ septic effluent. <br /> A pumping chamber will need to be installed to lift the efflLient to the <br /> treatment area. <br /> The manifold and supply line pipe must liave back drainage to the pumping <br /> chamber. The distribution pipes shall have their ends capped. Be sure <br /> the rock and sand fill material are clean. The sod layer below the <br /> entire mounded area must be turned over, just break up the sod, be sure <br /> not to over work. <br /> The power supply and switches must be located outside the manhole and <br /> pumping chamber in a weather proof enclosure. A warning device must be <br /> installed with a light and sound device, this is in case of a pump failure. <br /> (Mercury floats are a good method) . <br /> All neighboring wells are located greater than 10'0 ' away from the <br /> proposed treatment area. <br /> CONT' D <br />
The URL can be used to link to this page
Your browser does not support the video tag.