Laserfiche WebLink
• <br /> Orono Ilion School Drawing Date:02/23:16 4/30/18 11 :22 <br /> :22 <br /> HYDRAULIC DESIGN INFORMATION SHEET <br /> Job Name: Orono High School J :iti <br /> 2018 <br /> Location: 795 North OLD CRYSTAL BAY RD <br /> Long Lake CITY OF ORONO <br /> Drawing Date: 02/23/18 Remote Area Number: 2 <br /> Contractor: Breth-Zenzen Fire Protection Te .ephone:320--363-0900 <br /> 8053 Sterling Drive <br /> Suite, 101 <br /> St. Joseph, MN 56374 clgAN <br /> Designer: Paul Secord <br /> Calculated By:SprinkCAD <br /> www.sprinkcad.com <br /> 451 N. Cannon Ave. <br /> Lansdale, PA 19446 <br /> Construction: II B Occupancy:E <br /> Reviewing Authorities:City of Orono <br /> SYSTEM DESIGN _-- <br /> Code:NFPA 13 Hazard:ORD GRPTI System Type:WET <br /> Area of Sprinkler Oper: 1528 sq ftl Sprinkler. or Nozzle <br /> Density (gpm/sq ft) 0.150 I Make: Tyco <br /> Area per Sprinkler 114.0 sq ft( Model: TY-FRB <br /> Hose Allowance Inside 0 gpm I K-Factor: 5. 60 <br /> Hose Allowance Outside 250 gpm I Temperature Rating: 200 <br /> CALCULATION SUMMARY 14 Flowing Outlets <br /> gpm Required: 508. 9 psi Required: 50.6 8 City Supply <br /> WATER SUPPLY <br /> Water Flow Test ( Pump Data ( <br /> Date of. Test 11-28-1.8 I Rated Capacity 0 gpm I <br /> Static Pressure 58.0 psi I Rated Pressure 0. 0 ps.i. I <br /> Residual Pres 52.0 psi I Elevation 0 <br /> At a Flow of 1190 gpm I Make: <br /> Elevation 1 ' 6" I Model: <br /> Location: Hydrant in front of building <br /> Source of Information: City of Orono <br /> SYSTEM VOLUME 2126 Gallons <br /> Notes: <br /> MN <br /> 55:356 <br />