Laserfiche WebLink
Project Name: Ii Plan Review and Inspection Checklist <br /> ORit i Opy NFP. 13(2010 Edition) Page 1 of 5 <br /> Plan <br /> SystemInspection <br /> Component Section Review Comments <br /> Yes No `, Yes No <br /> General Information <br /> 1 Do all areas have sprinkler coverage? 4.1 <br /> 2 Partial system? 4.2&Div sion Policy <br /> FP-07 2007 <br /> 3 Wet system being installed? 3.4.10 L/' <br /> 4 Dry system being installed? 3.4.5 %/' <br /> 5 Antifreeze system being installed? 3.4.1 ✓' <br /> 6 Preaction system being installed? 3.4.9 ", <br /> 7 Deluge system being installed? 3.4.4 —fes of 1 <br /> 8 Is sufficient data provided to review plans? 22.1.3 A moi' �4. -i sq/� <br /> 9 Is sufficient data provided to review calculations? 22.3.2 v'' <br /> �"! � <br /> 10 Manufacturer's data sheets for any specially listed 22,1.4 ‘.(-- <br /> equipment f <br /> provided? <br /> 11 Proper site plan? ✓ <br /> 12 Proper cross section? 22.1.3(4) ti <br /> _13 Dry system capacity indicated? 22.1.3.17 <br /> 14 Proper occupancy class of each area? 22.1.3(7) %.- <br /> Water <br /> Water Supply Information <br /> 1 Does system have an automatic water supply? 23.1.1 <br /> 2 Stored water supply? 23.2.4 v <br /> 3 Vortex plate provided? NFPA 20 <br /> 4.14.10 <br /> 4 Is supply piping material plastic? 23.1.6.1 ✓' <br /> 5 Does flow test information appear accurate? 22.2.1 <br /> 6 Has a listed fire pump been installed? 23.2.2 k/ <br /> 7 Fire pump performance curve or annual lest provided? -----.._„ <br /> 8 Have simultaneous domestic uses through a 4.2&Division Policy V <br /> combined service been properly taken into account? FP-06 2007 <br /> 9 Hydraulic design information is posted at riser? 24.5.1 <br /> 10 General Information Sign posted at riser? 24.6 1/' <br /> ValvesDirectional <br /> ( And Control) <br /> 1 Are all control valves listed indicating type, <br /> requiring 5 seconds to operate? 6.7.12 t..." <br /> 2 Is a riser check valve provided? 8.16.1.1.3.1 <br /> 3 Is there at least one control valve at each water <br /> supply source? 8.16.1.1.1.2 V <br /> 4 Are valves supervised? MSCF 903.4 <br /> 5 Are valves secured? MSFC 903.4 <br /> 6 Are valves accessible? MSFC 508.5.4 <br /> 7 Is proper signage provided? 6.7.4&MSFC <br /> 510.1 <br /> 3 <br /> ,, <br /> 36 <br /> �� 7( , / / / z. g -Pr' i ...___ _________. 1_ 5--5- <br /> 3 x <br /> 1 = C(_3 , j y-) = Z) 4- S r <br />