Laserfiche WebLink
Builder Acknowledgement Form <br /> Permit#2018-00517 <br /> Builder Representative Name: Kuhl Design & Build, LLC <br /> Permit Conditions: Initials IL <br /> Erosion control mechanisms must be installed and inspected by the City prior to any land disturbing �4/ <br /> activities. The contractor must provide a minimum of a 24 hour notice prior to inspection. <br /> Erosion control shall be installed and maintained throughout the entire project and must remain until V <br /> vegetation has been established. <br /> A haul route shall be submitted to the City Engineer for approval and inspection prior to commencement ofti <br /> hauling from the site. The property owner shall be responsible for cleaning and repair of roadways for any <br /> adverse impacts. <br /> Prior to the release of the escrow funds a final inspection must be completed and all disturbed areas <br /> established with vegetation. Please note established vegetation means perennial cover with a density oft <br /> 75%. Seed blankets or sowing grass seed it not considered established vegetation. <br /> ADVISORY COMMENTS <br /> Any changes to the exterior/landscaping improvements, i.e. patios, grading, sidewalks, retaining walls, etc. /(/ <br /> not currently shown on the approved survey and landscaping plan will require a separate Zoning Permit <br /> application to be submitted and approved prior to the work commencing. <br /> Any retaining walls that are over 4-feet in height or tiered walls not separated by twice of the height of the <br /> lower wall require engineered plans and a building permit to be submitted and approved prior to constructio <br />