My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-00245 - windows
Orono
>
Property Files
>
Street Address
>
S
>
Sixth Avenue North
>
2160 Sixth Ave N - 27-118-23-31-0017/ & 24 0003
>
Permits/Inspections
>
2018-00245 - windows
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:19:47 PM
Creation date
1/18/2019 11:49:40 AM
Metadata
Fields
Template:
x Address Old
House Number
2160
Street Name
6th
Street Type
Avenue
Street Direction
North
Address
2160 6th Avenue North
Document Type
Permits/Inspections
PIN
2711823310017
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' PLAN REVIEW CHE�LIST FOR NEW STRUCTURES / ADDITIONS <br /> Address: � ��� � ��� Permit No.: ���¢' lQ0���j <br /> Description of work: _�n l�',c �i �j�/`; � d G�(,t/ Date Rec'd: � � <br /> Septic review by: Date Approved: <br /> Zoning review by: Date Approved: <br /> Building review by: � Date Approved: � <br /> Grading review by: Date Approved: <br /> Zoning District: Zoning File#: Reso#: Reso Date: <br /> Zoning: Lot Area: /AC Width: Lot Coverage: SF % <br /> Survey Submitted: � Yes 0 No Date of Survey: Revised date(?): <br /> Landscape plan submitted? 0 Ye � No Landscaper: <br /> Proposed Setbacks: <br /> Front(Lake) Rear(Street) ( N S E W ) ( N S E W .� Other Buildings Wetland <br /> Side Side � <br /> Defined Height: Peak Height: FFE: FFE minus 6 feet= (Existing Contour) <br /> Perimeter(linear feet) = 5Q%= L.F. below grade <br /> Basement? � Yes � No, Stories <br /> ` <br /> FOR A BUILDING WITH A BASEMENT OR CRAWL SPACE: FOR A BUILDING ON A SLAB FOUNDATION: <br /> The distance between the lowest proposed Slab at or above grade— <br /> START W ITH floor(of the basement or crawl space)and measure from hiqhest existing <br /> the highest point of the roof. START WITH rade to the highest point of the <br /> roof even if fill was brought in to <br /> If you have a... <br /> elevate home. <br /> SUBTRACTION • GABLE OR HIPPED ROOF(no Slab below grade—measure <br /> (BASED ON windows): Subtract half the distance � , from highest existing grade to the <br /> ROOF TYPE) between the highest point of the roof hi hest oint of the roof. <br /> to the low point of the corresponding If you have a... <br /> gable or hipped roof • GABLE OR HIPPED ROOF <br /> SUBTRACTION (no windows): Subtract half <br /> • GABLE OR HIPPED ROOF(with (BASED ON <br /> windows): Subtract half the distance ROOF TYPE) the distance between the <br /> highest point of the roof to <br /> between the top of the highest the low point of the <br /> wi�dow and the highest point of the corresponding gable or <br /> roof <br /> hipped roof <br /> • ALL OTHER ROOF TYPES(flat, • GABLE OR HIPPED ROOF <br /> mansard,etc):No subtraction. (with windows): Subtract <br /> SUBTRACTION Subtract the distance between the half the distance between <br /> (BASED ON basemenUcrawl space floor and the the top of the highest <br /> EXISTING highest existing grade adjacent to the window and the highest <br /> GRADES) foundation OR 10 fee,t(whichever is less). point of the roof <br /> • ALL OTHER ROOF TYPES <br /> (flat,mansard,etc):No <br /> EQUALS Defined building,fieight subtraction. <br /> / Defined building height <br /> EQ LS <br /> Updated: October 2015 <br /> z:\forms\plan review checklist 10-2015.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.