My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
septic info
Orono
>
Property Files
>
Street Address
>
S
>
Sixth Avenue North
>
2150 Sixth Ave N - 27-117-23-31-0027
>
Septic
>
septic info
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:19:28 PM
Creation date
1/18/2019 11:30:29 AM
Metadata
Fields
Template:
x Address Old
Address
2150 Sixth Ave N
Document Type
Septic
PIN
2711723310027
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� w � <br /> S�'P TES TING� I NC. Steven B. Schirmers gx Debra M. Schirmers <br /> � . <br /> 951 Katydid Lane NE • St. Michael, MN 55376 • (612) 497-3566 <br /> FAX (612)-497-5011 <br /> State License#394 <br /> June 23, 1998 <br /> � ►'1� S �epor 'f' js .J`e �. <br /> Paul Phillips a.Ss i �2 � ^ e <br /> 2140 Co.Rd.6 � � � � f ��l.c��'�S S <br /> South lot � ` � O �.� �� � <br /> Orono, Henn. Co., X v��� <br /> /l��r �- �, <br /> �pp ��l . � Z�� 9 <br /> This on-site sewag <br /> accordance with th <br /> ordinances. Apprc <br /> driveway easemer <br /> The soils on this site are SCS soils mapped - HcC2 - Hayden clay loam bordered by Gc <br /> - Glencoe silty clay loam. The seasonally saturated soits were located at 20" to 34" <br /> (mottled soil). Due to the seasonally saturated soils, a Pressurized Mound System will <br /> need to be installed to treat septic effluent. The bottom of the treatment area must be <br /> located at least 3' above the saturated soils. <br /> The soils at a depth of 12" have a percolation rate averaging 4.6 mpi. <br /> A pumping chamber will need to be installed to lift the effluent to the treatment area. <br /> The power supply and switches must be located outside the manhole and pumping <br /> chamber in a weather proof enclosure. A waming device must be installed with a light <br /> and sound device, this is in case of a pump failure. <br /> The manifold and supply line pipe must have back drainage to the pumping chamber. <br /> The distribution pipes shatl have their ends capped. Be sure the rock and sand fill <br /> material are clean. The sod layer below the entire mounded area must be turned over, <br /> just break up the sod, be sure not to over work. <br /> � � � s � � � � <br /> � � <br /> � � � <br /> � �"��:, � �. <br /> �����c� A �'� � <br /> . � '1�� sK`�<, ��1 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.