My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
bldg permit application info
Orono
>
Property Files
>
Street Address
>
S
>
Sixth Avenue North
>
2135 Sixth Ave N - 27-118-23-31-0005
>
Misc
>
bldg permit application info
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:19:37 PM
Creation date
1/17/2019 3:19:25 PM
Metadata
Fields
Template:
x Address Old
House Number
2135
Street Name
6th
Street Type
Avenue
Street Direction
North
Address
2135 6th Avenue North
Document Type
Misc
PIN
2711823310005
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br /> 9. All applications for structures which require driveway access or involve a change <br /> in use of an existing access to a County highway or City road, must be <br /> accompanied by an access permit issued by the Hennepin County Highway <br /> Department or Orono Public Works Department. <br /> 10. For projects which will require the installation of an on-site sewage treatment <br /> system, a site evaluation report and system design must be submitted with the <br /> building pemut application. (See On-Site Systems Manager for more information.) <br /> 11. For all projects located within 1,000' of lakeshore, shoreland regulations and <br /> hardcover limitations apply. Hardcover, by definition, is any structure, blacktop, <br /> or other material which interferes to any degree with the direct absorption of <br /> rainfall into the ground. Hardcover calculations must accompany each application <br /> involving additional or replacement proposed hardcover in the affected zoning <br /> districts. (See "Hardcover Worksheet" available at City offices.) <br /> C. One set of building plans and spec�cations noted with corrections or code compliance date <br /> and stamped as approved by the Building Official will be returned with the permit. T�' <br /> �nro��,y must be ke�t on the individual job site available to ins�ection personnel <br /> throughout the construction. <br /> D. A Certificate of Occupancy-is required.prior-to the use or occupancy of any new structure <br /> erected within the City. This certif cate will be issued by the Building Official at such <br /> time as final inspections demonstrate that code compliance has been achieved. Final <br /> inspections are required for all existing structures altered or changed in use. Changes in <br /> the use of the commercial structure must also be approved by the Zoning Department. <br /> E. Time of Construction. Section 12.05 <br /> Subd. 1. Pemut Expiration. Notwithstanding continuing or on-going work, any <br /> building permit issued by the City shall expire and by limitation be null and <br /> void and shall require issuance of a new pemut and payment of a full new <br /> permit fee if a Certificate of Occupancy and final completion has not been <br /> issued within the following length of time after the date of pemut issuance, <br /> which new permit and fee shall be necessary to reimburse the City for on- <br /> going and more than normal number and cost of inspection services. <br /> A. Single Family Residential dwellings, including new construction, <br /> remodeling or additions: 24 months. <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.