My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
bldg permit application info
Orono
>
Property Files
>
Street Address
>
S
>
Sixth Avenue North
>
2135 Sixth Ave N - 27-118-23-31-0005
>
Misc
>
bldg permit application info
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:19:37 PM
Creation date
1/17/2019 3:19:25 PM
Metadata
Fields
Template:
x Address Old
House Number
2135
Street Name
6th
Street Type
Avenue
Street Direction
North
Address
2135 6th Avenue North
Document Type
Misc
PIN
2711823310005
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br /> BUILDING PERMIT APPLICATION PROCEDURE <br /> Each application for a building pemut shall be accompanied by the data indicated below. Failure <br /> to submit complete information will result in return of applications. Please read carefully the <br /> listed re�uirements. <br /> 1. ALL APPLICATIONS <br /> A. Completed application forms including all information required in the numbered spaces, <br /> dated and signed by applicant. <br /> B. Two copies of building plans, drawn to scale, together with specifications containing the <br /> minimum information noted below: (requirement for building plans n�be waived by the <br /> Building Official for small structures or minor work). One set will remain on file with the <br /> City and one set will be retumed to applicant. <br /> Residential Plan reviews will require a minimum of 7 to 10 working days for staff review. <br /> All new commercial structures must be approved by the Orono Council. Modification of <br /> existing commercial structures will require a minimum of 2 weeks for staff review. <br /> Minimum Information Required: <br /> 1. CERTIFICATE OF SURVEY (signed by a registered land surveyor). A survey <br /> is required for all types of construction including new homes, room additions, <br /> porches, decks and accessory buildings. The survey must include the legal <br /> description of property, location of existing and proposed structures on the site, <br /> location of all proposed improvements such as driveways, retaining walls, decks, <br /> sidewalks, etc. Lakeshore lots must show existing and proposed contours in <br /> minimum 2' increments. (Minunum survey standards handout available at City <br /> offices.) <br /> Survey Requirement Exemption - A survey will not be required for detached <br /> accessory structures of less than 1,000 s.f. in total floor area when �1 of the <br /> following conditions are met:* <br /> a) The area of the properry exceeds the minimum lot width/lot area standards . <br /> of the zoning district. <br /> b) Owner/applicant has staked the location of the proposed structure meeting <br /> the required setbacks, and the property comer pins are staked and visible <br /> and a plot map of the property drawn to scale has been submitted. <br /> c) Owner/applicant has obtained written non-objection of most-affected <br /> adjacent property owner. <br /> *A survey will not be required for accessory structures without foundations and <br /> with less than 120 s.f. of projected roof area if b and c are met. <br /> A site inspection by City staff is required. Site inspection fee is $30.00 and shall <br /> be paid with the building permit. <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.