My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1993-005562 - repair septic
Orono
>
Property Files
>
Street Address
>
S
>
Sixth Avenue North
>
2100 Sixth Ave N - 27-118-23-31-0024
>
Septic
>
1993-005562 - repair septic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:19:53 PM
Creation date
1/17/2019 2:54:49 PM
Metadata
Fields
Template:
x Address Old
House Number
2100
Street Name
6th
Street Type
Avenue
Street Direction
North
Address
2100 6th Avenue North
Document Type
Septic
PIN
2711823310024
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�-F TESTING� ll�C. Steven B. Schirmers — MPCA Cert. No. 627 <br /> 951 Katydid Lane NE • St. Michael, MN 55376 • (612) 497-3566 <br /> July 19 , 1993 <br /> Revised August 9 , 1993 <br /> The Woodlands Inc. <br /> 2100 Co.Rd. 6 <br /> Orono, Henn. Co. , MN <br /> This On-Site Sewage Treatment System is Designed for a Group Home <br /> with 6-1 bedroom units at 100 gal/day plus 5 staff at 15 gal/day <br /> = 675 ga1/day. The water meter indicates an average water use of <br /> 865 gal/day with the water softner putting out 120 gal/day (244 <br /> gal/recharge every 2 days) . The total water use is 745 gal/day <br /> without the water softner. When sizing the system using a metered <br /> water use, multiply 1.5 times for peak water use = 1117 gal/day. <br /> Designed in accordance with the Minnesota Pollution Control Agency <br /> Chapter 7080 and local ordinances . <br /> The soils on this site are SCS soils mapped - HcB2 - Hayden clay <br /> loam. A seasonally high water table was located at 22" to 30" <br /> (mottled soil ) . Due to the seasonally high water table, a <br /> Pressurized Mound System will need to be installed. The bottom <br /> of the rock bed must be located at least 3 ' above the seasonally <br /> high water table. <br /> This site has an existing failing trench system due to the strong <br /> clay soils with a high water table. The existing tanks may be <br /> used upon approval by the local Inspector. Due to all the water <br /> going through a pump in the lower level , recommend to increase <br /> the tank capacity with one additional 1500 gallon tank in front <br /> of the existing 3-1000 gallon. <br /> The soils at a depth of 12" have a percolation rate averaging <br /> 8.9 min/inch. Test Holes #4 & 5 are compacted and must not <br /> be used. <br /> A pumping chamber will need to be installed to lift the effluent <br /> to the treatment area. <br /> The manifold and supply line pipe must have back drainage to the pumping <br /> chamber. The distribution pipes shall have their ends capped. Be sure <br /> the rock and sand fill material are _ clean. The sod layer below the <br /> entire mounded area must be turned over, just break up the sod, be sure <br /> not to over work. <br /> CONT' D <br />
The URL can be used to link to this page
Your browser does not support the video tag.