Laserfiche WebLink
_ �°� <br /> , o 0 <br /> �� CITYof ORONO <br /> �I � .'� '�r���.-� �+ <br /> \�� � r,�,, ' ��, �!� � Municipal Offices <br /> \�,� �' ' ��:ryG� Street Address: Mailin�Addrou: <br /> \'�'�gHOg' 2150 Keiley Parkway P.O. Box 66 <br /> Orono, MN 55356 Crystal Bay, MN 55323-0066 <br /> September 6, 2000 <br /> Orono Woodlands, Inc. <br /> 2100 Sixth Avenue North <br /> Long Lake, NIN 55356 <br /> To Whom It May Concern: <br /> An inspection of your septic system was conducted on September 5, 2000. A summary of the <br /> inspection is below. <br /> Se�tic Tank Condition <br /> 1. Pumpout not needed at this time. <br /> The septic system is a compliant system, meaning it meets all or most current City and State <br /> Standards. Enclosed is a list of licensed contractors who work in Orono on a regular basis. This <br /> list is enclosed simply for your reference in�ase your septic system needs maintenance in the future. <br /> Also enclosed is a fact sheet explaining your septic system and how it functions. Finally, an as-built <br /> drawing is enclosed showing the approximate location of the septic system. <br /> If you have any questions regarding this report, please contact me at the City Offices at 249-4600. <br /> Re ect , <br /> � <br /> � �� <br /> Chris Pence <br /> On-Site Systems Manager <br /> Enclosures <br /> In the event this inspection report is used to satisfy the requirements for a mortgage or other transfer of property, <br /> be ad�•ised that this report does no guarantee or certif�the esisting sy stem will continue to function properly,but <br /> is merel�an opinion of the adequacy of the system under current conditions based on the available information. <br /> This report must be kept on the premises with the system location an�i pumping records. <br /> Telephone(952)249-4600 • Fax(952)249-4616 <br /> www.ci.orono.mn.us <br />