My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Re: septic system-sewer
Orono
>
Property Files
>
Street Address
>
S
>
Sixth Avenue North
>
2100 Sixth Ave N - 27-118-23-31-0024
>
Correspondence
>
Re: septic system-sewer
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:19:56 PM
Creation date
1/17/2019 2:19:50 PM
Metadata
Fields
Template:
x Address Old
House Number
2100
Street Name
6th
Street Type
Avenue
Street Direction
North
Address
2100 6th Avenue North
Document Type
Correspondence
PIN
2711823310024
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. �� c� d S �����r� f���� F�,� <br /> ��� ��� °� � . <br /> ��'o_;__ o ;, . <br /> i,i, � � ���T C ITY of ORONO <br /> t 1a e�.} - '�,t _ � �II' <br /> \ "�+� �, �������_-� �,� Munici al <br /> � p Offices <br /> �� ��-�^, -� ��_�. '�,�; <br /> '::j; ,_�`�; G ,% <br /> � Street Address: <br /> ���'�.� ��•� ��g�%� Mailing Address: <br /> �EgII� � 2750 Kelley Parkway P.O. Box 66 <br /> Orono, MN 55356 Crystal Bay, MN 55323-0066 <br /> October 21.2003 <br /> Dear�'ei�hborhood Residents; <br /> � pressure se�i-er system is currently beina installed in your neighborhood. This sewer system is <br /> a�•ailable for hookup by neiQhborhood residents on a voluntary basis at this time. You can continue <br /> to use your e�cisting septic system until the s�-�m fails or is required to be replaced because of it's <br /> nonconformina status. The present deadline tor the replacement of non conforming septic systems <br /> is 2010. A conforming septic system can continue to be used until it either fails or is rendered <br /> nonconformin� by future septic reaulations. <br /> The se�ti-er connection fee is cunently 58,�00 and will be adjusted for inflation on an annual basis. <br /> This connection fee can either be paid before connection to the sewer system or be assessed over a <br /> 1�-�-ear time period at a 6.2�%annual interest rate. A signed assessment waiver will be required if <br /> �-ou request to be assessed for the connection fee. <br /> In addition to the connection fee,there is a on:rime SAC fee of$1,27�. This SAC fee increases on <br /> an annual basis and is payment for the additional costs of the future downstream capacity in the <br /> �ietropolitan Council Sewer System. <br /> This pressure sewer system requires that each property owner install and maintain their own <br /> indi�-idual grinder pump station. A"proaressi�-e cavity"grinder pump will be required,and the City <br /> needs to approve the pump that will be install� to ensure compatibilit5�with the sewer system. The <br /> estimated property owner costs for the grindzr pump station, service connection, and septic tank <br /> abandonment can range from�7,000 to 512,000 depending on the len�th of the service connection <br /> required. The City's current flat rate user ch:rIIe for residential sew-er is approximately $90.00 per <br /> quarter. <br /> PaQe 1 <br /> Telephone(9�2)2-�9-4600 • Fax(952)249-4616 <br /> ���.ci.orono.mn.us <br />
The URL can be used to link to this page
Your browser does not support the video tag.