Laserfiche WebLink
Christine Mattson <br /> From: Melanie Curtis <br /> Sent: Thursday, January 14, 2016 8:37 AM <br /> To: John Thiesse(jthiesse@srfconsulting.com) <br /> Cc: Christine Mattson <br /> Subject: FW: Trinity Sign at 2060 Sixth Ave N. <br /> John <br /> To quickly follow up from our email conversation... the as-built contours will not be needed; the as-built survey as <br /> submitted will suffice (we will inspect and verify in spring and after old sign removal). Absent photos showing completed <br /> re-vegetation and landscaping around the new sign we will need to hold the escrow until verification by our inspector in <br /> the spring. He will also verify visually the as-constructed compliance of the proposed grading on site. I will let Christine <br /> follow up with Ken but I wanted to let you know where we fell on this. <br /> Later- <br /> Melanie <br /> Melanie Curtis <br /> '�952.249.4b27 �mcurtis@ci.orono.mn.us <br /> From: Naples Jenson [mailto:mkjenson7@gmail.com] <br /> Sent:Thursday,January 14, 2016 8:32 AM <br /> To:Christine Mattson<CMattson@ci.orono.mn.us> <br /> Cc:lerilyn Lowe<thejlowe@aol.com>; Pastor Brian Fragodt<brianf@trinitylonglake.org>;John Thiesse <br /> (jthiesse@srfconsulting.com)<jthiesse@srfconsulting.com>; Mike Gaffron<MGaffron@ci.orono.mn.us>; Melanie Curtis <br /> <MCurtis@ci.orono.mn.us>; Roger Peitso<rpeitso@ci.orono.mn.us> <br /> Subject:Trinity Sign at 2060 Sixth Ave N. <br /> Christine, The old Trinity Sign will be removed next week; we now have frozen surface to work on. John <br /> Thiesse will submit revised As-Built Survey for Trinity after old sign removal. I will be leaving for Florida <br /> tomorrow. I have a long copy list here as I wanted to provide information to all those involved in this initiative <br /> before I head South. <br /> While probably not necessary, I thought I would review the sequence and provide a few photos of new Trinity <br /> Sign prep, landscaping, and installation. We have appreciated the positive comments from members of Trinity <br /> and of our Community. The sequence included.......... <br /> • Site survey to confirm proper position for new Sign 10 feet offset from Trinity Property Line. <br /> • Installation of foundation pillars and sign attachment structure. <br /> • Stripping sod and black dirt from peninsula area around new sign position. <br /> • Backfill with clay soil for proper build-up and slope. <br /> • Black dirt topping. <br /> • Mulch topping. <br /> I trust Trinity Escrow Funds of$700 paid with Application for Conditional Use Permit will be refunded after <br /> old sign removal and revision of As-Built Survey previously submitted on December 28. Again, John Thiesse <br /> will be our Trinity focal point. <br /> i <br />