My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1995-007246 - repairing mound
Orono
>
Property Files
>
Street Address
>
S
>
Sixth Avenue North
>
2060 Sixth Ave N - 27-118-23-31-0002
>
Permits/Inspections
>
1995-007246 - repairing mound
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:19:30 PM
Creation date
1/17/2019 1:18:43 PM
Metadata
Fields
Template:
x Address Old
House Number
2060
Street Name
6th
Street Type
Avenue
Street Direction
North
Address
2060 6th Avenue North
Document Type
Permits/Inspections
PIN
2711823310002
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
} . <br /> . ' <br /> CITY OF ORONO S�PTICSYSTE�IPERNIITAPPLICAT`ION <br /> Box 66 (2750 Kelley Parkway) <br /> Crystal Bay, ��1 55323 <br /> JOB SITE ADDRESS: �6�c c� � �d- �' <br /> Occupancy Type: Residential <br /> Commercial Other <br /> Permit Type: i�'ew or Replacement System, $100.00 <br /> Repair EYisting System, $ 50.00 �C� � <br /> (Tanl:s or Drainfield) <br /> 0.�0 State surcharge added to above fees <br /> *See fee schedule for non-residential permit fees <br /> �– �- ���-�One Number: <br /> Owner's Name: �ti'� �£ -� <br /> Nlailing Address: City: �P� <br /> Contractor's I�Tame: � e ��-� PhoneNumber: <br /> Mailing Address: (.��� ����-- ./�i•� - — City: �P� <br /> DO NOT MAIL PAYMENT WITH THIS APPLICATION <br /> GENERAL INSTRUCTIONS <br /> 1. Applications for septic system permits may be mailed or submitted in person at the City <br /> Offices; however, permits will not be mailed out. The permit must be picked up in <br /> person at the City Offices and work must not begin unless the permit card is on the job <br /> site. <br /> 2. Permits will be issued only to contractors holding a City of Orono Septic System <br /> Installers License. <br /> 3, All work must be done in accordance with the approved septic system design. Design <br /> reports are not considered approved unless accompanied by the "City of Orono Septic <br /> System Approval" cover sheet signed by the City Inspector. <br /> 4. The following inspections will be required for all septic systems: <br /> A. Pre-installation site inspection to include inspector, installer, and general contractor. <br /> B. Tank installation prior to covering. <br /> C. Drainfield trench installation prior to covering. For mounds, inspection is required <br /> after rough-up but prior to sand placement (sand will be jar tested for silt content), <br /> and a�ain during pressure distribution piping installation in t y rock be�d• S�tion <br /> D. F i n a l i n s pection to veri f y proper fmal cover depths and to verif that all ump <br /> (where required) components are functional and comply with codes. <br /> 5, Individual holding MPCA Installer Certificate shall be present during inspections: A 24- <br /> hour notice is required for all inspections. <br />
The URL can be used to link to this page
Your browser does not support the video tag.