Laserfiche WebLink
- .__-__-: <br /> _ �"� <br /> � � � <br /> /i�o `. <br /> (� o '�`� <br /> �, '�'; CITY of UltONO <br /> ��. � : �;: <br /> ': , �G,, : Municipal Offices <br /> `,„�, i. ' ti , <br /> � '� � -'� G Street Address: Mailing Address: <br /> �9kEs�p4�� 2750 Kelley Parkway P.O. Boz 66 <br /> ._. - Orono, MN 55356 Crystal Bay, MN 55323-0066 <br /> To: The Current Owner of Address r� �� �' ��� <br /> City Ordinance requires that onsite sewage treatment systems in Orono be <br /> inspected on a periodic basis. The onsite sewage treatment system at the above <br /> address has been inspected and the following is known about the system. A <br /> sketch of the known components of the system is available for most properties at <br /> the Orono City Hall. <br /> Imminent Public Health Threat <br /> Yes �No <br /> If yes, please contact the Onsite Systems Manager at 952-249-4626 within 10 <br /> days of recei�t of this notice. The septic system must be brought into compliance <br /> within 90 days. Failure to do so will result in referral to the City Attorney for <br /> legal action. <br /> System Identified as Non-Compliant <br /> Yes <br /> No � <br /> If yes, system must be brought into compliance by: <br /> December 31, 2007 <br /> December 31, 2010 <br /> Other <br /> Septic Tank(s) Pump out Needed <br /> Yes �No <br /> The City recoinmends the septic tanlc(s) and/or lift tanl:be serviced and pumped <br /> out every three years. City records indicate the tank(s) were last pumped out on <br /> � — l�� � � . The tank(s) should be cleaned through the manhole and <br /> not through the inspection pipes, this allows for proper cleaning. <br /> Gomments: <br /> �... <br /> ,;�7' ' m. <br /> Inspe�tdi��'�'��' '� �.,� Date of Inspection � '� � <br /> '�'elen�one (��2)249-�60(� � �aa (9�2) 2�9-�6��, <br /> w�w�ar.ci.o�ono.ma�.us <br />